The Surge in AI data Center Construction is the Boom in Industrial Diesel Generator Deployment




Figures of Soaring AI Data Center Construction Following AI Boom

Public available data shows the investment to data center construction has rocketed by 6 times ever since November 2022 when ChatGPT was released, remarking the dawn of AI and data center rush. The figure was still 841 million SD in the United States, yet patently skyrocketed to $5.37 billion USD in August 2026 – a historical upsurge of some $ 4.259 billion.

A data center that typically operating with maximum demand power of 100 MW usually install diesel generators offering power far more than the former so that the facility can continuously operate even when some generators are out of service. Such is why, accompanying the surge of AI data center construction, the market inevitable sees a growing demand of diesel generators regardless of bunches of sustainable and clean energy options available for being integrated to the data center.

That said, the boom in AI data center construction is equivalent to the boom for diesel generators. A facility at large scale can have hundreds of generators with each one offering 2~4 MW, and sized at the footprint of a train car, deployed in a pattern as shown in Figure 1. [1]

Satellite imagery of diesel generators and data center site layout (Left) Satellite image of the Amazon data center at 10321 Tanner Way, Manassas, VA. This site has 93 Caterpillar 3516C-HD generators, each with a standby capacity of 2.5 MW. Purple highlights indicate where the generators are located. (Right) Detail showing seven generator units (in full enclosures) with one unit highlighted in purple. Source: Google Earth, 8/19/2023.
Fig 1. Satellite Image of Diesel Generators Installed in Amazon Data Center at 10321 Tanner Way, Manassas, VA

Backup Diesel Generators are Indispensable for Data Center Facility

The development of AI Data Center has its path charted towards two ambitions. One is about the operational effectiveness, another is the operation consistency.

The industry looking for architectural design of AI data centre facility by replacing the UPS with HVDC power distribution network while further exploring the feasibility of SST intends to resolve the concerns around PUE (Power Usage Effectiveness) for better operational sustainability. This is the part about how data center facility can better utilize the power.

AI Server Data Center with Solid State Transforming Stepping down MVAC directly to 800 VDC for server rack
Fig 2. Diesel Generator is still Essential for an SST-Based AI Data Center

The operational consistency in data center facility is safeguarded by several layers, from integrated BBU to the facility-level integrated grid-forming BESS that prevents the operation from shutdown in the event of grid outage. In the worst case, it is then the diesel generator that functions as what the facility relies on ultimately – no data center facility can neglect the essentialness diesel generators as the backup power.

Capacity of diesel generators installed for data center at global scale has reached 55 GW in 2024 according to an industrial report published by the Better Data Center Project. [2]

What Specifications to Validate Is there any Standard to Comply with?

The industry does not yet have dedicated standards or regulations for data center diesel generators. However, load testing in accordance with ISO 8528 – which applies to reciprocating internal combustion engine-driven AC generating sets – can serve as a reference.

The application of ISO 8528 for data center oriented diesel generators is fundamentally grounded on the rating classification that serves for determining industry adoption. Therefore, the equipment is categorized to meet specific Uptime Institute Tier requirements. [3]

For operators, they must validate the generator against specific rating categories according to data center’s intended load and uptime goals, which are:

  • Emergency Standby Power (ESP): The maximum power available during a variable electrical power sequence, under stated operating conditions, for a limited number of hours per year (typically limited to 200 hours).
  • Prime Power (PRP): The maximum power available during a variable power sequence for an unlimited number of hours per year.
  • Continuous Power (COP): The maximum power a generator can deliver continuously for an unlimited number of hours under a constant electrical load.
  • Data Center Continuous (DCC) or Data Center Power (DCP): A specialized manufacturer rating (often evaluated alongside Uptime Institute standards) that applies COP-level continuous unlimited hours of operation, specifically tailored for data center variable loads without the average load restrictions of PRP.

Testing environment setup against generators following a specific category among the above-mentioned ones do not have to engage a real load considering the risk using live infrastructure of devices. Load test is thus conducted during FAT or SAT stage by validating the source from gensets with load banks or programmable load simulators.

High-Power is the “Must” for Diesel Generator Testing Scenarios

Load simulation testing for diesel generators shares some features in common compared to that for power distribution network and equipments where the load replicates the profiles of GPU clusters and server racks. Nevertheless, its testing application has the focus varied as the load side of the former corresponds to rather things like transformer or UPS whose power profiles are less volatile compared to the server load.

High-power capability is still a must. Parallelling rack mount programmable loads with hundreds of them in connection to reach the MW-scale power output from diesel generator seems to be an option. However, one should take into account as well the surrounding wirings and devices for safety, monitoring, control and configuration. A dedicated MW-scaled load simulator would be the alternative equipment ideally for replacing the conventional approaches by parallel-connecting rack mount units.

The massive power requirements come in form of the challenge of extreme energy consumption. Dissipating megawatts of electricity as pure heat during extended 24- to 72-hour load tests is economically and environmentally prohibitive. The cost and facility footprint required for HVAC and cooling measures that handle the colossal heat stress generated, were the testing conducted by load banks, eventually turn into an unrealistic bill that comprises significant financial debt.

A testing setup diagram illustrating a diesel generator with direct medium voltage generation (10.5 to 13.8kVAC) feeding power into a row of Action Regenerative AC Load Simulator cabinets, which then feeds and regenerates energy back into the utility grid.
Fig 3. Diesel Generator Load Testing with Regenerative High-Power AC Load Simulator

Consider ActionPower’s MW Programmable Power and Load Simulators

When it comes to validating multi-megawatt backup power systems, compromise is not an option. Data center operators and generator manufacturers require testing solutions that deliver uncompromised capacity, critical load-profile emulation, and true sustainability.

Consider Actionpower’s MW Programmable Power and Load Simulators. Engineered specifically for extreme-scale testing environments, our solutions combine unmatched parallel scalability with advanced regenerative technology. By precisely replicating complex, non-linear facility loads while returning massive amounts of test energy back to the grid, Actionpower ensures that your diesel generators are thoroughly validated—protecting both your critical uptime and your bottom line.

Bibliography

  • [1] Generator Sizing for AI Data Centers: What the New Math Looks Like, Build Technologies, Inc., Link
  • [2] Diesel Generators at Data Centers: Status, Impacts, and Protective Practices, Better Data Center Project, Link
  • [3] Understanding ISO 8528 Generator Set Ratings, PowerHour webinar series for consulting engineers, Link

 


ActionPower research and development team

Talk to ActionPower

From ActionPower we are open to listening to your suggestions and opinions.

For further media contact or consultation about any topics which might be of your interest about our company, you will be welcomed to send us an email to:

info@actionpowertest.com

Latest News


PRL DC Load Simulator Introduced by ActionPower for AI Server Workload Validation

Dynamics and power regeneration are no longer compromise to each other. Adopting innovation topology technologies is the PRL DC Load Simulator that accommodates ultra-fast dynamics, regenerative load and high-power scalability from a united single system.



ActionPower to Debut MIX Series Hybrid Power Supply at Europe Automotive Testing Expo 2025

The latest hybrid programmable power supply by ActionPower comes with 6 channels hybrid interface and allows AC/DC module arbitrary combination for flexible testing configuration where both AC and DC are...



CONTANCT US

Zhiwei Bao, SEO Engineer and technical copywriter at ActionPower
About the Author

Zhiwei Bao

Industrial Automation Power Electronics Product Marketing Field Application

Zhiwei Bao holds 20+ patents in the field of mechanical engineering and is keen on industrial automation and product marketing. His interdisciplinary background, along with his passion and initiative for learning, has led him to a profound understanding of power electronics. He manages the technical copywriting for programmable power and testing topics at ActionPower through product-marketing-driven approaches.

About Zhiwei Bao

Explore More

Why Linear Loads Demonstrates Better Dynamics Performance than Regenerative Ones? And How ActionPower Breaks the Boundary?

Why Linear Loads Demonstrates Better Dynamics Performance than Regenerative Ones? And How...

Conventional testing applications where programmable electronic loads are deployed used to see a definite trade-off between dynamic performance and the...



combination of software and hardware is battery cycler's key feature

Grid Code Compliance Test Explained: What to Validate and Which Standards to...

Facing the modern grid landscape is the ever more important grid interconnection and interoperability, since DERs are now enacting as...



Battery Testing Automation Enegy Storage System ActionPower

Managing Testing Applications for Grid-Forming vs Grid-Following with MVA Utility-Scale Grid Simulators

Modern power systems, integrated with microgrids [1] and Distributed Energy Resources (DERs), have shifted their operational mechanisms from centrally-dominated architectures...




Get in Contact

Global Contact

Sales Network & Locations

If you are looking for an automated test system to validate your products during development and research stages to make sure of their successful commercial launch, ACTIONPOWER will be at your disposal to study your specifications and requirements to provided either standard or customized testing solutions.

Product Inquiry

Specification-matching testing and simulation solutions need discussion of both parties. Actionpower welcomes you inquirt to study together with us about how we can automate your testing processes.

Send Inquiry

Trade Shows & Events

These are the upcoming events and places you can find ACTIONPOWER and talk with us face-to-face!

Check Events

Social Media

Follow us to keep updated of our innovations.

LinkedInTwitter
Quick Model Access

Smart Discovery

Access our Power Supply Wizard to find the right programmable power supply for your use cases and testing scenarios.

discover programmable power supply by filtering with current, voltage and power ranges
CONTACT US

Contact Us

Professionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?

Subscribe to Newsletter

Thank you for subscribing!