Public available data shows the investment to data center construction has rocketed by 6 times ever since November 2022 when ChatGPT was released, remarking the dawn of AI and data center rush. The figure was still 841 million SD in the United States, yet patently skyrocketed to $5.37 billion USD in August 2026 – a historical upsurge of some $ 4.259 billion.
A data center that typically operating with maximum demand power of 100 MW usually install diesel generators offering power far more than the former so that the facility can continuously operate even when some generators are out of service. Such is why, accompanying the surge of AI data center construction, the market inevitable sees a growing demand of diesel generators regardless of bunches of sustainable and clean energy options available for being integrated to the data center.
That said, the boom in AI data center construction is equivalent to the boom for diesel generators. A facility at large scale can have hundreds of generators with each one offering 2~4 MW, and sized at the footprint of a train car, deployed in a pattern as shown in Figure 1. [1]

Fig 1. Satellite Image of Diesel Generators Installed in Amazon Data Center at 10321 Tanner Way, Manassas, VA
The development of AI Data Center has its path charted towards two ambitions. One is about the operational effectiveness, another is the operation consistency.
The industry looking for architectural design of AI data centre facility by replacing the UPS with HVDC power distribution network while further exploring the feasibility of SST intends to resolve the concerns around PUE (Power Usage Effectiveness) for better operational sustainability. This is the part about how data center facility can better utilize the power.

Fig 2. Diesel Generator is still Essential for an SST-Based AI Data Center
The operational consistency in data center facility is safeguarded by several layers, from integrated BBU to the facility-level integrated grid-forming BESS that prevents the operation from shutdown in the event of grid outage. In the worst case, it is then the diesel generator that functions as what the facility relies on ultimately – no data center facility can neglect the essentialness diesel generators as the backup power.
Capacity of diesel generators installed for data center at global scale has reached 55 GW in 2024 according to an industrial report published by the Better Data Center Project. [2]
The industry does not yet have dedicated standards or regulations for data center diesel generators. However, load testing in accordance with ISO 8528 – which applies to reciprocating internal combustion engine-driven AC generating sets – can serve as a reference.
The application of ISO 8528 for data center oriented diesel generators is fundamentally grounded on the rating classification that serves for determining industry adoption. Therefore, the equipment is categorized to meet specific Uptime Institute Tier requirements. [3]
For operators, they must validate the generator against specific rating categories according to data center’s intended load and uptime goals, which are:
Testing environment setup against generators following a specific category among the above-mentioned ones do not have to engage a real load considering the risk using live infrastructure of devices. Load test is thus conducted during FAT or SAT stage by validating the source from gensets with load banks or programmable load simulators.
Load simulation testing for diesel generators shares some features in common compared to that for power distribution network and equipments where the load replicates the profiles of GPU clusters and server racks. Nevertheless, its testing application has the focus varied as the load side of the former corresponds to rather things like transformer or UPS whose power profiles are less volatile compared to the server load.
High-power capability is still a must. Parallelling rack mount programmable loads with hundreds of them in connection to reach the MW-scale power output from diesel generator seems to be an option. However, one should take into account as well the surrounding wirings and devices for safety, monitoring, control and configuration. A dedicated MW-scaled load simulator would be the alternative equipment ideally for replacing the conventional approaches by parallel-connecting rack mount units.
The massive power requirements come in form of the challenge of extreme energy consumption. Dissipating megawatts of electricity as pure heat during extended 24- to 72-hour load tests is economically and environmentally prohibitive. The cost and facility footprint required for HVAC and cooling measures that handle the colossal heat stress generated, were the testing conducted by load banks, eventually turn into an unrealistic bill that comprises significant financial debt.

Fig 3. Diesel Generator Load Testing with Regenerative High-Power AC Load Simulator
When it comes to validating multi-megawatt backup power systems, compromise is not an option. Data center operators and generator manufacturers require testing solutions that deliver uncompromised capacity, critical load-profile emulation, and true sustainability.
Consider Actionpower’s MW Programmable Power and Load Simulators. Engineered specifically for extreme-scale testing environments, our solutions combine unmatched parallel scalability with advanced regenerative technology. By precisely replicating complex, non-linear facility loads while returning massive amounts of test energy back to the grid, Actionpower ensures that your diesel generators are thoroughly validated—protecting both your critical uptime and your bottom line.

Zhiwei Bao holds 20+ patents in the field of mechanical engineering and is keen on industrial automation and product marketing. His interdisciplinary background, along with his passion and initiative for learning, has led him to a profound understanding of power electronics. He manages the technical copywriting for programmable power and testing topics at ActionPower through product-marketing-driven approaches.
About Zhiwei Bao
If you are looking for an automated test system to validate your products during development and research stages to make sure of their successful commercial launch, ACTIONPOWER will be at your disposal to study your specifications and requirements to provided either standard or customized testing solutions.
Specification-matching testing and simulation solutions need discussion of both parties. Actionpower welcomes you inquirt to study together with us about how we can automate your testing processes.
Send InquiryThese are the upcoming events and places you can find ACTIONPOWER and talk with us face-to-face!
Check EventsProfessionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?