Find out the latest innovations from ActionPower
The constant growing demands of implementing calibration and in-house verification and validation process following the production as the end-of-line has addressed the increasing need of power testing technologies and test equipment due to which the production line nowadays consumes more energy than previously.
Yet either from the standpoint that official authorities are enforcing new regulations that aim for reducing carbon and GHG emission or that from the perspective of energy saving of operation and production, traditional test power supply units which sink and dissipate power as heat are no longer able to meet the expectation of end-users. Further concern apart from the energy cost is the heat generated from the testing process against which cooling device is essential for head removal and thus to avoid measurement errors, leading to further operational cost.
ActionPower’s regenerative power supplies are your options for cost-effective solutions that are free from heat-related issues, and to reap further benefits with our marketing-leading precision and dynamics for upscaling your calibration and validation.
As the most basic type of load used in electrical testing, either in the form of AC or DC electronic load, resistive load follows strictly Ohm’s Law where \( I=(V/R) \) by which the discharged power of \( P=I \times V \) is converted 100% directly into heat with the maximum loadable power dependent on the resist load circuit’s rating.
Cooling and heat dissipation of resistive load (resistive load bank or traditional non-regenerative resistive test load) can either be achieved with air or water yet a concern here comes further is that fans and air-conditioning are not additional energy burden that are neither free to turn up. Water-cooling, on the other side, has limited application and availability considering the water connection to UUT and may contain additives or contaminants that may cause electrical hazard in case that a leak happens with the water-cooling system.

Fig 1. Sequence Diagram of Testing with Resistive Load
The primary advantage and difference of regenerative load compared to resistive one is that the former is able to sink and then convert the power back into usable for to either the facility or local utility grid, thus to both save energy cost and reduce heat dissipation.

Fig 2. Battery Tested by DC Electronic Load with Regenerative Feedback
Supposing a test scenario where a battery as UUT and DC power source is being validated and connected to a Regenerative DC Electronic Load, the latter would converts the DC power received into AC power that is synchronized to local grid with safe connection. The regenerative load process is achieved by the following steps and with key methods of circuit and control:
DC-DC Converter (Buck/Boost):
Regulates the input DC voltage/current from the DUT to a suitable level for inversion. Controlled via high-speed PWM signals.
DC-AC Inverter (Full-Bridge):
Converts the regulated DC power into synchronized AC using a full-bridge topology. It is managed by a DSP controller that includes a PLL (Phase-Locked Loop) to lock onto the grid’s frequency and phase.
Grid Interface (LC Filter + Transformer + AC Output):
The AC output is filtered through an LC filter to remove switching noise. An optional transformer provides isolation and voltage scaling before connecting to the grid, enabling clean and safe energy re-injection.

Fig 3. Simplified Circuit of Regenerative Load
The advantage of regenerative load in terms of head reduction can be estimated by some calculations and comparison with that of resistive load.
Refer back to the figure 1 where a simplified testing process using a resistive load is described and suppose that the Unit Under Test with a conversion efficiency of 95% is rated to provide an output of 200 kW. The heat waste caused from the conversion would be:
Further and subsequently after the output is sunk by the resistive electronic load, the 200kW output is directly converted into waste heat. Adding then the heat waste from the UUT, a total waste from the testing process is then 210.52 kW, equivalent to the following heat generated per operation hour:
The subsequent process of cooling will consumer more considerable and significant power for heat removal from the testing environment.
Supposing then the resistive electronic load is replaced by a regenerative and bidirectional power supply with a 94% load efficiency.
The UUT will still generate, according to the give rated power and conversion efficiency, 10.52kW of heat waste.
While on the side of the regenerative power supply, the load will feedback 94% of the output power from UUT which will be 188kW back to the facility, generating only heat waste of 12W.
An evident result of heat waste reduction is then achieved in this case with only a 22.52kW total waste generated, compared to 210.52 kW as that of testing with resistive load and with 188 kw of waste head reduced and a reduction rate of 89.3% reached.

Fig 4. Sequence Diagram of Testing with Regenerative Load
(*) Note that with above calculations the power of chiller has not been taken into consideration.
While the above calculation and assumed scenarios of testing with resistive load and regenerative load has provided a rough idea of how much heat waste and energy saving can be reduced with the latter, ActionPower has developed as well a ROI calculator for your availability to calculate in a facilitated way about how much money you may save with a regenerative load or power supply.
When every kilowatt counts, switching to a regenerative load isn’t just a technical upgrade yet a smart and future-setting business decision.
ActionPower’s regenerative power supplies not only deliver precision and reliability for advanced testing scenarios, but also recycle energy back to the grid, dramatically cutting your electricity bills and thermal management costs. With long-term operational savings, modular scalability, and powerful software integration, ActionPower helps you test smarter, greener, and more cost-effectively.

TITAN Series AC programmable power supply is designed for holistically and comprehensively replicating grid conditions with powerful programmability over three-phase AC system.
Key Features

Zhiwei Bao holds 20+ patents in the field of mechanical engineering and is keen on industrial automation and product marketing. His interdisciplinary background, along with his passion and initiative for learning, has led him to a profound understanding of power electronics. He manages the technical copywriting for programmable power and testing topics at ActionPower through product-marketing-driven approaches.
About Zhiwei Bao
If you are looking for an automated test system to validate your products during development and research stages to make sure of their successful commercial launch, ACTIONPOWER will be at your disposal to study your specifications and requirements to provided either standard or customized testing solutions.
Specification-matching testing and simulation solutions need discussion of both parties. Actionpower welcomes you inquirt to study together with us about how we can automate your testing processes.
Send InquiryThese are the upcoming events and places you can find ACTIONPOWER and talk with us face-to-face!
Check EventsProfessionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?