Find out the latest innovations from ActionPower
Modern power energy system are getting more diverse than ever with both conventional thermal generating stations (coal, gas, nuclear) and renewable systems joined to construct a complex network of power generation and power consumption with sophisticated interaction and interoperation logics. Relying on the power systems are both residential, commercial and industrial facilities which would never expect suffering from either a partial or total outages, or at least there is something to support their normal operation during the term for maintaining economic stability and public safety.
DERs (Distributed Energy Resources), with grid-forming capability [1], in such a context, assume the essential roles of sustaining the power systems during the blackout, referring to which the key capability is defined as black start. [2] This session of technical article focuses on how to set up a testing sequence with programmable power supplies – in specific, grid simulators and battery simulators – to conduct the validation against power conversion system (PCS) regarding its blackstart capability and how responsive it interacts with the emulated grid and energy resources during and after the outage conditions.
ActionPower’s profile emulator and power supplies have been supporting the advancement of renewable energy sectors and microgrid technologies, more information about our past projects can be found on our reference page.
The operation of DERs does not follow a fixed patter but primarily in two modes which are Grid-Following mode and Grid-Forming mode.
Grid-Forming capability represents a fundamental shift of DERs from conventional system acting as passive “current sources” which are dependent on a stable external grid for anchoring a given stable voltage and frequency, rather, into a resilient system that can operate as independent “voltage sources” [3]. To put it in a word, this means grid-forming DERs can autonomously establish voltage and frequency for providing critical inertia and stability support, similar to traditional synchronous generators.
Blackstart is defined as the procedure to recover a power system from a total or partial shutdown (zero-voltage state) using localized energy sources, independent of the main transmission network. In modern microgrids, the Power Conversion System (PCS) serves as the primary coordinating element, transitioning through several critical functional states during the restoration sequence. Understanding these phased operations will support the programmable power testing setup.

Fig1. An Exemplar Topology of Micro-Grid Joined by DERs – Credit: ActionPower
The outset of blackstart involves the triggering of the grid-forming control algorithm. PCS utilizes the energy from energy storage system (ESS)‘s DC-link to establish the initial voltage magnitude pf \(V\) and frequency of \(f\) on the common AC bus. PCS, at this stage, assumes the role of operating as a stiff voltage source that manages transient inrush currents associated with the energization of downstream transformers and distribution lines.
Active balance phase comes after the completion of establishing nominal voltage. As a variety of loads from the power system is incrementally reconnected to the point of common coupling (PCC), the PCS must maintain system stability through Droop Control \(P-f\) and \(Q-V\) or Virtual Synchronous Machine (VSM) [4] emulated inertia.
The PCS provides the necessary active power \(P\) to match the load demand and reactive power \(Q\) to regulate the voltage profile. Its ability to mitigate frequency deviations \( \Delta f\) and voltage dips \(\Delta V\) during step-load changes is the benchmark for its grid-forming performance.
The final stage of blackstart is the coordination with the utility grid recovery and the simultaneous transition – which happens when the stable voltage signal is detected fro mthe main grind at the PCC and PCS initiates the resynchronization procedure.
The PCS’s control logic must align its internal voltage phase angle (\\delta)\, frequency, and amplitude with the recovering external grid. Once the synchronization criteria (e.g., zero phase-angle difference) are met, the PCS facilitates a seamless reconnection, transitioning from an autonomous voltage source back to a grid-interconnected operating mode without disrupting the power supply to the localized loads.
Testing a PCS’s blackstart capability in real grid context is surrealistic – such is why a testing platform built with programmable power systems is indispensable. The testing platform setup requires fundamentally two variations of programmable power supplies with typically profile emulation capabilities, which are regenerative grid simulator and high-power battery simulator. Take note that not all battery simulators are capable of simulating a utility-scale energy storage systems in this case.

Fig 2. Back-to-Back Testing Platform for Power Conversion System
The Battery Simulator serves as the primary DC energy source during the black start sequence. Unlike a standard DC power supply, a high-performance battery simulator must replicate the dynamic impedance and voltage-current (\ V-I )\ characteristics of a specific battery chemistry (e.g., Li-ion or LFP).
The Regenerative Grid Simulator is the most versatile component in the B2B setup, acting as a programmable AC environment that shifts roles as the test progresses.
IEEE 1547.1 defines the standard conformance test procedures for distributed energy resources (DER) interconnection. In the context of a blackstart, this standard ensures that a grid-forming PCS maintains dynamic stability and safety during both autonomous operation and grid reconnection.
The core validation requirements are summarized as follows:
For more detailed information and precise compliance limits, please refer to the official IEEE 1547.1 Standard Documentation.
Validating the performance of energy storage systems and DERs under blackstart and grid-code scenarios has become essential for modern power systems. This is particularly true as regulatory bodies, such as IEEE and UL, increasingly enforce stringent requirements for grid-forming operations and system restoration.
ActionPower provides scalable MW-class grid simulation and programmable power testing platforms, including its distinctive tower-type high-power test systems designed for utility-scale laboratories. The flexible expansion and platform recomposition capability, high unit power, and fast dynamic response as if a modular rackmout unit – all these features set ActionPower a distinctive source of solutions in the field of renewable energy power testing and DERs system validation.
Contact us or check our references before taking actions – we welcome your outreach to discuss with us the potentials that we advance your renewable energy technologies ahead.

Zhiwei Bao holds 20+ patents in the field of mechanical engineering and is keen on industrial automation and product marketing. His interdisciplinary background, along with his passion and initiative for learning, has led him to a profound understanding of power electronics. He manages the technical copywriting for programmable power and testing topics at ActionPower through product-marketing-driven approaches.
About Zhiwei Bao
If you are looking for an automated test system to validate your products during development and research stages to make sure of their successful commercial launch, ACTIONPOWER will be at your disposal to study your specifications and requirements to provided either standard or customized testing solutions.
Specification-matching testing and simulation solutions need discussion of both parties. Actionpower welcomes you inquirt to study together with us about how we can automate your testing processes.
Send InquiryThese are the upcoming events and places you can find ACTIONPOWER and talk with us face-to-face!
Check EventsProfessionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?