Blackstart Testing Setup for Power Conversion Systems (PCS) with Grid and Battery Simulators to Validate Grid-Forming Capability




Modern power energy system are getting more diverse than ever with both conventional thermal generating stations (coal, gas, nuclear) and renewable systems joined to construct a complex network of power generation and power consumption with sophisticated interaction and interoperation logics. Relying on the power systems are both residential, commercial and industrial facilities which would never expect suffering from either a partial or total outages, or at least there is something to support their normal operation during the term for maintaining economic stability and public safety.

DERs (Distributed Energy Resources), with grid-forming capability [1], in such a context, assume the essential roles of sustaining the power systems during the blackout, referring to which the key capability is defined as black start. [2] This session of technical article focuses on how to set up a testing sequence with programmable power supplies – in specific, grid simulators and battery simulators – to conduct the validation against power conversion system (PCS) regarding its blackstart capability and how responsive it interacts with the emulated grid and energy resources during and after the outage conditions.

ActionPower’s profile emulator and power supplies have been supporting the advancement of renewable energy sectors and microgrid technologies, more information about our past projects can be found on our reference page.


What Does Grid-Forming Mean for Distributed Energy Resources?

The operation of DERs does not follow a fixed patter but primarily in two modes which are Grid-Following mode and Grid-Forming mode.

Grid-Forming capability represents a fundamental shift of DERs from conventional system acting as passive “current sources” which are dependent on a stable external grid for anchoring a given stable voltage and frequency, rather, into a resilient system that can operate as independent “voltage sources” [3]. To put it in a word, this means grid-forming DERs can autonomously establish voltage and frequency for providing critical inertia and stability support, similar to traditional synchronous generators.

Introduction to Blackstart and PCS’s Functionality during Restoration and until Grid Recovery

Blackstart is defined as the procedure to recover a power system from a total or partial shutdown (zero-voltage state) using localized energy sources, independent of the main transmission network. In modern microgrids, the Power Conversion System (PCS) serves as the primary coordinating element, transitioning through several critical functional states during the restoration sequence. Understanding these phased operations will support the programmable power testing setup.

point of common coupling - System architecture diagram of an electrical microgrid network. A central electricity bus connects to a Main Grid via a Point of Common Coupling and an AC/DC converter. Distributed resources including a Battery (DC/DC), Diesel Generator (AC/DC), Photovoltaic array (DC/DC), Wind Turbine (AC/DC), and an EV Load are also connected. Red arrows indicate bidirectional power flow for the grid (PGrid) and battery (Pbat), and unidirectional flow for the other components (PLoad, Ppv, Pwt, Pdg).
Fig1. An Exemplar Topology of Micro-Grid Joined by DERs – Credit: ActionPower

Zero-Voltage Synchronization and Bus Energization

The outset of blackstart involves the triggering of the grid-forming control algorithm. PCS utilizes the energy from energy storage system (ESS)‘s DC-link to establish the initial voltage magnitude pf \(V\) and frequency of \(f\) on the common AC bus. PCS, at this stage, assumes the role of operating as a stiff voltage source that manages transient inrush currents associated with the energization of downstream transformers and distribution lines.

Dynamic Load Management and Frequency Regulation

Active balance phase comes after the completion of establishing nominal voltage. As a variety of loads from the power system is incrementally reconnected to the point of common coupling (PCC), the PCS must maintain system stability through Droop Control \(P-f\) and \(Q-V\) or Virtual Synchronous Machine (VSM) [4] emulated inertia.

The PCS provides the necessary active power \(P\) to match the load demand and reactive power \(Q\) to regulate the voltage profile. Its ability to mitigate frequency deviations \( \Delta f\) and voltage dips \(\Delta V\) during step-load changes is the benchmark for its grid-forming performance.

Resynchronization and Seamless Grid Reconnection

The final stage of blackstart is the coordination with the utility grid recovery and the simultaneous transition – which happens when the stable voltage signal is detected fro mthe main grind at the PCC and PCS initiates the resynchronization procedure.

The PCS’s control logic must align its internal voltage phase angle (\\delta)\, frequency, and amplitude with the recovering external grid. Once the synchronization criteria (e.g., zero phase-angle difference) are met, the PCS facilitates a seamless reconnection, transitioning from an autonomous voltage source back to a grid-interconnected operating mode without disrupting the power supply to the localized loads.

Click to Discover a Summarized Sequence Diagram of Blackstart

$$
\begin{array}{|c|}
\hline
\text{Stage 1: Zero-Voltage Synchronization & Bus Energization} \\
\hline
\downarrow \\
\text{Control: Grid-Forming (GFM) Startup} \\
\text{Action: Establish } V_{ref} \text{ and } f_{ref} \text{ via DC-Link Energy} \\
\text{Challenge: Managing Inrush Current } (I_{inrush}) \\
\hline
\end{array}
$$$$
\downarrow
$$$$
\begin{array}{|c|}
\hline
\text{Stage 2: Dynamic Load Management & Frequency Regulation} \\
\hline
\downarrow \\
\text{Mechanism: Droop Control } (P-f, Q-V) \text{ or VSM} \\
\text{Input: Incremental Load Connection at PCC } (P_{Load}) \\
\text{Metric: Minimizing } \Delta f \text{ and } \Delta V \text{ during transients} \\
\hline
\end{array}
$$$$
\downarrow
$$$$
\begin{array}{|c|}
\hline
\text{Stage 3: Resynchronization & Seamless Grid Reconnection} \\
\hline
\downarrow \\
\text{Operation: Phase-Angle } (\delta) \text{ and Frequency } (f) \text{ Alignment} \\
\text{Condition: } |V_{PCS} – V_{Grid}| < \epsilon \text{ and } \Delta \delta \approx 0 \\
\text{Result: Transition from Autonomous Source to Grid-Tied Mode} \\
\hline
\end{array}
$$

Testing Platform Setup and Roles of Programmable Power Systems

Testing a PCS’s blackstart capability in real grid context is surrealistic – such is why a testing platform built with programmable power systems is indispensable. The testing platform setup requires fundamentally two variations of programmable power supplies with typically profile emulation capabilities, which are regenerative grid simulator and high-power battery simulator. Take note that not all battery simulators are capable of simulating a utility-scale energy storage systems in this case.

Testing System Topology Power Conversion System (PCS) - System architecture diagram illustrating a megawatt-scale testing setup for a Power Conversion System (PCS). On the left, a TITAN Series Battery Simulator with regenerative load capabilities supplies the DC input. In the center, the PCS is represented by DC-DC and DC-AC inverter blocks. On the right, a 10 MVA TITAN Series Regenerative Grid Simulator with an integrated RLC modeling circuit handles the AC grid connection. Dashed lines show central measuring instruments monitoring both the DC and AC lines.
Fig 2. Back-to-Back Testing Platform for Power Conversion System

Emulated Energy Storage Systems with Battery Simulator

The Battery Simulator serves as the primary DC energy source during the black start sequence. Unlike a standard DC power supply, a high-performance battery simulator must replicate the dynamic impedance and voltage-current (\ V-I )\ characteristics of a specific battery chemistry (e.g., Li-ion or LFP).

  • Dynamic Source Characteristics: In the first stage of black start, the PCS draws a rapid surge of power to energize the bus and downstream transformers. The simulator must maintain DC-link stability without triggering over-current protection.
  • State-of-Charge (SoC) Emulation: It allows the test engineer to simulate the PCS’s behaviour under various battery conditions – such as a low SoC state where the DC voltage is near the cut-off threshold – so that the GFM algorithm can still initiate a stable AC ramp-up.
  • Bidirectional Energy Flow: During the grid recovery phase, if the microgrid begins exporting power, the simulator must switch to sink mode to absorb energy, maintaining the DC-link voltage within the operational limits of the PCS.

Replicate grid interaction with Grid Simulator

The Regenerative Grid Simulator is the most versatile component in the B2B setup, acting as a programmable AC environment that shifts roles as the test progresses.

  • Zero-Voltage Environment (Blackout Emulation): Initially, the simulator provides a high-impedance, zero-voltage state. It monitors the PCS’s output without providing any synchronization reference, thereby forcing the PCS to operate in a true Grid-Forming mode to establish the bus voltage.
  • Active/Regenerative Load Simulation: Once the PCS establishes the bus, the Grid Simulator transitions into a Programmable Load mode. It can emulate complex load profiles, including non-linear loads and inductive motor starts (Cold Load Pickup), to test the PCS’s \(P-f\) and \(Q-V\)regulation. Its regenerative capability ensures that the AC power generated by the PCS is fed back into the facility’s utility, preventing overheating and improving energy efficiency.
  • Grid Recovery and Synchronization Target: In the final stage, the simulator generates a controlled AC voltage to represent the “Main Grid” return. It allows for the precise adjustment of phase-angle offsets and frequency drifts to validate the PCS’s Resynchronization logic before the final reconnection.

Phased Testing Sequences for Blackstart Capability Validation against PCS

$$
\begin{array}{|c|}
\hline
\mathbf{Phase \ 1: Hardware \ Initialization \ \& \ Static \ Readiness} \\
\hline
\text{Battery Simulator: Set DC Voltage Profile } (V_{dc}) \\
\text{Grid Simulator: High-Impedance Mode } (V_{ac} = 0, f = 0) \\
\text{Target: Verify PCS Control Logic \& Aux Power Readiness} \\
\hline
\end{array}
$$$$ \downarrow $$$$
\begin{array}{|c|}
\hline
\mathbf{Phase \ 2: GFM \ Startup \ \& \ Bus \ Energization} \\
\hline
\text{Action: PCS Command to “Blackstart Mode”} \\
\text{Focus: Soft-start V/f Ramp-up Curve} \\
\text{Metric: Peak Inrush Current } (I_{peak}) \text{ \& Settling Time } (t_s) \\
\hline
\end{array}
$$$$ \downarrow $$$$
\begin{array}{|c|}
\hline
\mathbf{Phase \ 3: Dynamic \ Load \ Pickup \ (Transient \ Stability)} \\
\hline
\text{Grid Simulator: Switch to Regenerative Load Mode} \\
\text{Sequence: Step Load Changes } (\Delta P, \Delta Q) \\
\text{Metric: Droop Performance } (\Delta f / \Delta P, \Delta V / \Delta Q) \\
\hline
\end{array}
$$$$ \downarrow $$$$
\begin{array}{|c|}
\hline
\mathbf{Phase \ 4: Grid \ Synchronization \ \& \ Recovery} \\
\hline
\text{Grid Simulator: Emulate Utility Grid Recovery } (V_{grid}) \\
\text{Action: Phase-Angle } (\delta) \text{ Matching \& Reconnection} \\
\text{Metric: Synchronization Error } (\Delta \delta \approx 0) \text{ \& Seamless Transition} \\
\hline
\end{array}
$$

Key Testing and Performance Requirements as per IEEE 1547.1

IEEE 1547.1 defines the standard conformance test procedures for distributed energy resources (DER) interconnection. In the context of a blackstart, this standard ensures that a grid-forming PCS maintains dynamic stability and safety during both autonomous operation and grid reconnection.

The core validation requirements are summarized as follows:

  • V/f Control Accuracy: During bus energization and steady-state operation, the PCS must maintain voltage fluctuations within \(\pm 10\%\) of nominal values and keep frequency deviations within a tight tolerance (e.g., \(\pm 0.1$ Hz\) to ensure a stable electrical environment.
  • Transient Response: When the Grid Simulator emulates a sudden load step, the PCS must utilize Droop Control or virtual inertia to limit the frequency dip \(\Delta f\) and ensure system recovery within the timeframes specified by the standard.
  • Synchronization Criteria: During the grid recovery phase, the voltage, frequency, and phase-angle differences \( \Delta \delta < 10^{\circ}\) between the PCS and the Grid Simulator must meet strict limits to ensure a seamless transition and avoid excessive transient current spikes.

For more detailed information and precise compliance limits, please refer to the official IEEE 1547.1 Standard Documentation.


Discover ActionPower’s Solutions for Utility-Scale DERs Grid-Code Testing

Validating the performance of energy storage systems and DERs under blackstart and grid-code scenarios has become essential for modern power systems. This is particularly true as regulatory bodies, such as IEEE and UL, increasingly enforce stringent requirements for grid-forming operations and system restoration.

ActionPower provides scalable MW-class grid simulation and programmable power testing platforms, including its distinctive tower-type high-power test systems designed for utility-scale laboratories. The flexible expansion and platform recomposition capability, high unit power, and fast dynamic response as if a modular rackmout unit – all these features set ActionPower a distinctive source of solutions in the field of renewable energy power testing and DERs system validation.

Contact us or check our references before taking actions – we welcome your outreach to discuss with us the potentials that we advance your renewable energy technologies ahead.

Bibliography

  • [1] What is Grid Forming? NESO – National Energy System Operator, Link
  • [2] The Challenges of Modelling Distributed Energy Resources (DERs) as Blackstart Resources and for Volt-VAR Optimality, Oak Ridge National Laboratory, Link
  • [3] Electrical devices: Voltage and current sources, Stanford University, Link
  • [4] Virtual Synchronous Machines, Sustainability Directory, Link

 

 

 


ActionPower research and development team

Talk to ActionPower

From ActionPower we are open to listening to your suggestions and opinions.

For further media contact or consultation about any topics which might be of your interest about our company, you will be welcomed to send us an email to:

info@actionpowertest.com

Latest News


PRL DC Load Simulator Introduced by ActionPower for AI Server Workload Validation

Dynamics and power regeneration are no longer compromise to each other. Adopting innovation topology technologies is the PRL DC Load Simulator that accommodates ultra-fast dynamics, regenerative load and high-power scalability from a united single system.



ActionPower to Debut MIX Series Hybrid Power Supply at Europe Automotive Testing Expo 2025

The latest hybrid programmable power supply by ActionPower comes with 6 channels hybrid interface and allows AC/DC module arbitrary combination for flexible testing configuration where both AC and DC are...



CONTANCT US

Zhiwei Bao, SEO Engineer and technical copywriter at ActionPower
About the Author

Zhiwei Bao

Industrial Automation Power Electronics Product Marketing Field Application

Zhiwei Bao holds 20+ patents in the field of mechanical engineering and is keen on industrial automation and product marketing. His interdisciplinary background, along with his passion and initiative for learning, has led him to a profound understanding of power electronics. He manages the technical copywriting for programmable power and testing topics at ActionPower through product-marketing-driven approaches.

About Zhiwei Bao

Explore More

diesel generator and data center for AI facility

The Surge in AI data Center Construction is the Boom in Industrial...

Figures of Soaring AI Data Center Construction Following AI Boom Public available data shows the investment to data center construction...



Why Linear Loads Demonstrates Better Dynamics Performance than Regenerative Ones? And How ActionPower Breaks the Boundary?

Why Linear Loads Demonstrates Better Dynamics Performance than Regenerative Ones? And How...

Conventional testing applications where programmable electronic loads are deployed used to see a definite trade-off between dynamic performance and the...



combination of software and hardware is battery cycler's key feature

Grid Code Compliance Test Explained: What to Validate and Which Standards to...

Facing the modern grid landscape is the ever more important grid interconnection and interoperability, since DERs are now enacting as...




Get in Contact

Global Contact

Sales Network & Locations

If you are looking for an automated test system to validate your products during development and research stages to make sure of their successful commercial launch, ACTIONPOWER will be at your disposal to study your specifications and requirements to provided either standard or customized testing solutions.

Product Inquiry

Specification-matching testing and simulation solutions need discussion of both parties. Actionpower welcomes you inquirt to study together with us about how we can automate your testing processes.

Send Inquiry

Trade Shows & Events

These are the upcoming events and places you can find ACTIONPOWER and talk with us face-to-face!

Check Events

Social Media

Follow us to keep updated of our innovations.

LinkedInTwitter
Quick Model Access

Smart Discovery

Access our Power Supply Wizard to find the right programmable power supply for your use cases and testing scenarios.

discover programmable power supply by filtering with current, voltage and power ranges
CONTACT US

Contact Us

Professionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?

Subscribe to Newsletter

Thank you for subscribing!