Find out the latest innovations from ActionPower

Either micro-grid or commercial power generation and distribution network of Solar and Wind energy faces the chances of instability like blackouts and grid outages and then they are still generating excessive power yet not transferred to the local utility grid.
This situation is referred to as islanding that can cause serious risk both to onsite technicians who are maintaining the facility as well as for the public safety [1], as specified in standards like IEC 62116、UL 1741、IEEE 1547.
Implementing proper anti-islanding measures for in power grid has evolved correspondingly as standards and regulations enforce companies to do so, against which trend the verification of devices with such functions have been growing conspicuously. ActionPower’s proven solutions to offer dynamic and precise testing equipment including PV simulators and advanced grid emulators for solar energy generation industries have been trusted by Sungrow and GoodWe, you may find more information by visiting our page of photovoltaic testing solutions.
A typical example of islanding happens with a solar energy generation system when solar panels feed a grid supply and which can be either a household solar installation or a large commercial solar farm and plant [2].
Despite that fact that islanding can sometimes be intentional [3], one of the islanding’s causes is when there are both battery storage and inverter are present in the solar panel system that the later converts the DC power generated from solar arrays into AC power for loads application. The islanding can happen when the battery is of excessive energy while the inverter continues let the system generate power independently to even there is grid outage or blackouts. The result would be that the affected area in the facility or installation is surrounded by lines that are not delivering power [4].

Supposing that in a community with solar energy system where substation breaker opens due to something as a fault happens so that it is disconnected from the local grid, meanwhile that PV inverters are still possibly looking for a voltage source in case that load by coincidence still matches the remaining generation from the PV, the feeder line then can be continued to be energized. It may happen that when electrical personnel who arrives to fix the issue will mistakenly perceive that the line has been disconnected from power, a result of which could be fatal electric shock.
Institute of Electrical and Electronics Engineers (IEEE) 1547 states in section 4 that an area electric power system must be de-energized within no more than 2 seconds when an islanding happens. [5]
Or say, the solar plant that energizes a specific part of the grid should detect the island once it happens and cease energizing the grid within 2 seconds to either ensure the electrical personnel’s safety as well as for the safety of devices along the interconnection against voltage and frequency runaway.
Anti-islanding is usually achieved through passive detection (monitoring grid conditions) or active detection (intentionally perturbing the system) while in real-world practice it is usually by the combination of both of them to detect when the utility grid goes offline and ceases the power export from the inverter.
Passive anti-islanding protection works by continuously monitoring electrical parameters of the grid to detect signs of disconnection.
The core idea is to identify abnormal changes in system behavior—such as deviations in voltage, frequency, or phase—that result from
power imbalances once the utility grid is lost. During normal operation, the main grid provides a strong regulating force to keep
these parameters within acceptable limits. However, when the grid is disconnected and the local generation and load are not perfectly
matched, those parameters may shift significantly, indicating a possible islanding condition.
Specifically, passive methods rely on observing three key indicators:
The greatest strength of passive protection lies in its simplicity and non-intrusive nature—it does not inject any signal into the grid,
thus preserving power quality. However, it suffers from a critical limitation known as the Non-Detection Zone (NDZ). This occurs when the power output of a distributed energy source closely matches the local load. In such cases, voltage and frequency may remain stable even after grid disconnection, making islanding difficult to detect.
Mathematically, NDZ is defined by the condition where both active and reactive power are balanced:
Under this condition:
Hence, the monitored parameters remain within their threshold limits, and the islanding event may go undetected. The size and shape of the NDZ depend on system characteristics and threshold settings, making it a crucial aspect of passive anti-islanding reliability assessment.
To overcome the limitations of passive methods, active anti-islanding protection introduces a proactive approach. These techniques involve injecting controlled disturbances into the grid to test the system’s response. The core principle is that during normal grid operation, disturbances are absorbed by the grid and have little effect. In an islanded state, however, these disturbances cause detectable anomalies that trigger protective actions.
Common active methods include:
The AFD method can be modeled as:
Where:
\( f_{\text{inv}} \) is the inverter output frequency
\( f_{\text{grid}} \) is the nominal grid frequency
\( k \) is the modulation coefficient
\( f_m \) is the modulation frequency
Active methods offer significant advantages, such as minimizing or eliminating the NDZ and delivering faster response times, often detecting islanding within 1 second. However, they may introduce slight disturbances to power quality, especially in weak grid environments. Careful tuning is essential to balance detection reliability with system stability.
ActionPower’s advanced range of grid and solar array simulator power supply together with programmable power supplies and loads are at your options to form testing platform and validate your inverter’s compliance and capability in reaction to real-world anomalies and grid conditions. As well as to test comprehensively your inverter under testing platform combining PV simulators and regenerative grid simulator such as the TITAN Series as well as to build real-time HIL for advanced validation against your inverter’s response to all possible operation conditions.

Zhiwei Bao's interdisciplinary background crossing industrial automation, mechanical engineering and product marketing paves the foundation to extending his profound understanding to power electronics for developing in-depth analysis and technical content for ActionPower. He converts complex testing applications and market trends into actionable technical insights.
About Zhiwei Bao
Actionpower awarded TDK North China the Strategic Partner Award in recognition of their outstanding support in product optimization, reliable delivery, and high-quality components—crucial during Actionpower’s milestone year of going public.
ACTIONPOWER secures key partnership with BYD, providing advanced EV testing systems to support high-performance validation and accelerate innovation in electric vehicle development.

If you are looking for an automated test system to validate your products during development and research stages to make sure of their successful commercial launch, ACTIONPOWER will be at your disposal to study your specifications and requirements to provided either standard or customized testing solutions.
Specification-matching testing and simulation solutions need discussion of both parties. Actionpower welcomes you inquirt to study together with us about how we can automate your testing processes.
Send InquiryThese are the upcoming events and places you can find ACTIONPOWER and talk with us face-to-face!
Check EventsProfessionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?