Home Contact EN
           
To the Top
           
Introduction
Technical Features
Solutions
Model Options
Insights
Contact

From single battery unit to megawatt-level energy storage system

Battery & ESS Testing Automation

On-grid devices face inevitable the transient and variable power grid changes against which they must react properly to ensure safety either for operation or for maintenance personnel.

 

From Battery to Megawatt ESS System

Modern electricity has no longer been as unpractical as the conventional way of producing and consuming at the same time due to the unavailability of systems that store energy. The latest battery technologies have revolutionized the way energy is produced, stored and use, either to retain excessively produced energy for future use or to support the electric grid by shifting peaks of consumption.

Upscaling from a single battery unit to a megawatt-level Energy Storage System (ESS), testing solutions may vary in technical design and methodology, but they all share core characteristics: precision, dynamics, repeatability, and responsiveness.

Battert ESS
 

Technical Must-Haves

Bidirectional Power Flow

Batteries and ESS are not simple one-way energy system but involve charging and discharging processes. Testing equipment must be capable of running bipolar.

bidirectional bipolar power flow is essential for ESS and battery testing

Ultimate Power Capability

Energy storage systems are somtimes of megawatt power capability for grid-scale applications. Testing equipment must match this ultimate power level to match the capability of ESS or the latest e-mobility battery's specifications.

ate power supply system in parallel mode to reach higher power level

Heat Management

Charging and discharging processes generate an abundant amount of heat that must be handled properly which otherwise will pose safety issues and testing feasibility problems. Testing system must be able to regeneratively handle this power flow.

power flow should be regenerative to reduce heat generation

Replicate Real-World Operation

E-mobility batteries experience constantly changing cycling conditions while ESS faces transient grid anomalies. Testing system must be able to reproduce these processes in lab condition.

simulating as if real battery in operation

ESS Testing Solutions

Battery ESS
  • PCS Validation
  • Distortion Response
  • Power & Capacity Test
  • Grid Forming & Following
  • More options

PCS Bidirectional Power Test

PCS in an integrated section in ESS that handles the bidirectional power flow between the latter and the grid or local loads and facilitates the conversion between AC and DC through charging and discharging processes.

Grid-Forming & Grid-Following

Harmonic distortion can negatively impact the performance of equipment and grid stability, while frequency response is essential for maintaining grid stability during fluctuations in supply and demand. Functionally compliant ESS can mitigate these issues by providing fast and flexible power adjustments yet this capability should be verified accordingly with testing equipment:

Peak Power & Capacity Test

Peak power and capacity tests for Energy Storage Systems (ESS) evaluate an ESS's ability to deliver maximum power and store a certain amount of energy, respectively. A combination of advanced testing equipment with bidirectional power flow and emulation capabilities are essential for setting up the testing loop.

Grid Forming / Following Test

Grid-forming and grid-following are two distinct control strategies for energy storage systems (ESS) connected to the power grid. Grid-forming ESS act as a voltage source, mimicking a traditional synchronous generator and providing inertia and voltage support. Grid-following ESS, on the other hand, synchronize with the grid voltage and inject power based on grid conditions. Both of them may be with a short reaction time of 5ms only.

Find more testing options...

Did not find the option that matches your requirement? Contact ActionPower to discuss what we can do for you.

  • Charge/Discharge Cycling
  • Dynamic Response
  • Cycle Life
  • SOC/SOH Validation
  • Safety Compliance

Charging & Discharging Cycling Test

Perform repetitive full charge and discharge tests to validate battery endurance and capacity retention. Simulate real-world load patterns including dynamic current curves and rest periods. Measure voltage stability, energy throughput, and cycle-related degradation. This is essential for lifetime estimation and thermal stability assessment.

Dynamic Response Test

Apply sudden load changes or input variations to evaluate how fast the battery reacts. Verify control loop speed and voltage/current overshoot or undershoot behavior. Monitor the BMS’s performance in fault scenarios like short-term overloads or reverse currents. Crucial for validating high-performance and safety-critical applications.

SOC/SOH Algorithm Validation

Validate battery management system (BMS) algorithms for estimating State of Charge (SOC) and State of Health (SOH). Run long-term controlled test sequences to capture capacity fade, internal resistance increase, and cycle degradation. Provide reference data for comparison with algorithm prediction accuracy. Helps fine-tune BMS firmware for reliable field operation.

Fast Charging Validation

Test battery packs under high-rate DC charging to assess performance and thermal response. Verify charging current limits, voltage balancing, and BMS coordination during fast charge cycles. Include stress scenarios such as low-temperature charging or high SOC conditions. Ensures compatibility with fast-charging infrastructure and safety requirements.

Safety Regulation Compliance

Simulate fault conditions such as overcharge, overcurrent, over-temperature, and cell imbalance. Validate protection mechanisms triggered by the BMS under unsafe conditions. Perform abuse tests while monitoring thermal runaway risk and fail-safe shutoff. Supports compliance with safety standards like UL 1973, UN 38.3, and IEC 62619.

Battery Testing Solutions

Battery ESS

Model Options for Battery & ESS Testing

Hardware
TITAN Solar panel simulator

TITAN Battery Simulator - 2000V, 1400A, 10MW

Simulating battery for e-mobility or storage system with ultimate power capability of upto 10MW by parallel operation mode.

Check Product
Hardware
NEXUS DC Power Supply - Bidirectional and Regenerative

NEXUS DC Power Supply - 2000V, 4500A, 5MW

Scalable architecture for high power implementation. Bidirectional ad regenerative load technology with versatile testing functionality.

Check Product
Hardware
TITAN Grid AC Power emulator for PV inverter testing

TITAN Scalable AC Emulator - 860V, 1600A, 10MVA

Regenerative AC source with comprehensive grid emulation capability supported by smart software

Check Product
Hardware
NEXUS PROGRAMMABLE AC POWER SUPPLY

NEXUS Regenerative AC Power Supply - 900V, 4500A, 400MVA

Regenerative AC source with comprehensive grid emulation capability supported by smart software

Check Product
Hardware
battery testing system ATE

BTS Battery Testbed ATE System

Simulating battery for e-mobility or storage system with ultimate power capability of upto 10MW by parallel operation mode.

Check Product
Hardware
PCS Power Conversion System Testing ATE testbed

PCS Testbed ATE System

Scalable architecture for high power implementation. Bidirectional ad regenerative load technology with versatile testing functionality.

Upcoming...
 

Frequently Asked Questions about Battery & ESS

› What’s the key difference between battery testing and ESS testing?

Battery testing focuses on cells, modules, or packs — assessing charge/discharge performance, capacity, internal resistance, cycle life, and thermal behavior.
ESS testing is system-oriented, evaluating bi-directional inverters (PCS), EMS scheduling, grid compliance, system efficiency, and operational safety.

› Why should temperature and aging be considered in charge/discharge cycle testing?

Over time, batteries accumulate heat, experience capacity fade, and exhibit performance drift. Effective testing requires thermal control, continuous SoH (State of Health) monitoring, and long-term performance logging to evaluate degradation trends and life expectancy.

› What does dynamic response testing of ESS include?

Typical dynamic tests involve:
– Fast step changes in charge/discharge load
– Frequency tracking and disturbance tolerance
– Harmonic injection and transient behavior under distorted grid conditions
These tests simulate real-world conditions for verifying system robustness and grid-interactive capability.

› What is a regenerative power source and how is it different from traditional loads?

A regenerative power source operates in both sourcing and sinking modes, returning absorbed power back to the grid instead of dissipating it as heat.
Advantages include:
– Energy saving during long-duration, high-power tests
– Reduced thermal management burden (e.g., less cooling needed)
– Fast, programmable response suitable for HIL and dynamic scenarios

› Why is harmonic and frequency response testing important?

PCS units must comply with grid standards (e.g., IEEE 1547, EN 50549), which include:
– Harmonic distortion limits
– Frequency shift tolerance
– Behavior under abnormal voltage/frequency
A programmable Grid Simulator with harmonic injection can emulate these grid disturbances to validate compliance and controller stability.

› How is peak power capability of batteries or ESS evaluated?

Peak power testing measures instantaneous output ability. Key aspects include:
– Duration of peak current/voltage (e.g., within 10 ms)
– Overshoot behavior
– Thermal response of the system

› How is EMS scheduling compatibility tested?

Power systems should support standard protocols like CAN, Modbus, or TCP/IP to interact with EMS platforms.
Testing includes:
– Sending various power targets and monitoring EMS command response
– Simulating fault or priority switching scenarios
– Evaluating multi-device coordination and dispatch logic

› What’s the difference between Grid-Forming and Grid-Following modes?

Grid-Following: Syncs with an existing grid’s voltage and frequency
Grid-Forming: Generates its own stable AC voltage and frequency, useful in black-start or island mode
Testing ensures the system can maintain power stability under standalone or microgrid conditions.

› What role does a bi-directional power supply play in battery and ESS testing?

Battery testing: Acts as a programmable load and source for charging/discharging cycles with regenerative capability
PCS testing: Simulates the battery-side DC source, validating AC output, grid interaction, and transient handling of the PCS

› What are the challenges in megawatt-level power testing?

– Electrical safety (e.g., isolation, arc flash, EMI mitigation)
– Controlling voltage/current rise/fall rate precisely
– Fast, reliable communication with EMS, monitoring systems, and DUT
– Effective energy recovery and thermal management (regenerative solutions preferred)

GET IN CONTACT

Quick Model Access

Smart Discovery

Access our Power Supply Wizard to find the right programmable power supply for your use cases and testing scenarios.

discover programmable power supply by filtering with current, voltage and power ranges
CONTACT US

Contact Us

Professionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?

Subscribe to Newsletter

Thank you for subscribing!