Application Use Apr 8, 2026
How to Replicate Weak Grid Conditions with SCR and X/R Mode of Grid Simulator?
Modern Grid Landscape with High DER Penetration and Weak Grid Conditions Modern grid landscape is no longer a...
Mathematically, the Rate of Change of Frequency is defined as the derivative of frequency \(f\) with respect to time \(t\):
$$ROCOF = \frac{df}{dt} \text{ (measured in Hz/s)}$$
The ROCOF testing as required by applicable grid code guidelines and regulations such as IEEE 1547 and IEC 62116 validates how resilient a renewable energy hardware or system such as inverters and power conversion system can withstand frequency shifting from the grid and maintains a near-constant standard frequency (50Hz or 60Hz) for the system. The steeper the slope \(df/dt\), the more severe the disturbance, respectively posing more strict challenges to the system's capability of managing unexpected situations and tripping the failures.
The following testing applications have key relation with ROCOF:
More information can be found correspondingly in ActionPower's technical articles about fault ride-through and application note for islanding test with RLC load bank.


To perform a valid ROCOF test that complies with IEEE 1547 or IEC 62116, the test system must transition frequency with microsecond precision while maintaining full control over power flow. A testing topology usually consists of from a DC side simulator (either battery simulator or solar array simulator power supply) and from the AC side a regenerative grid simulator for both replicating grid shifting conditions and recovery of the testing energy flow to utility.
Prepare SAS and Grid Simulator for stable operation
Power on the Solar Array Simulator (SAS) and set it to the EUT’s rated MPP (Maximum Power Point). Set the Grid Simulator to nominal voltage (e.g., 230V) and frequency (50Hz or 60Hz). This establishes a stable operating loop, emulating real-world conditions while allowing energy recovery through the testing topology.
Program the frequency ramp profile according to standards
Using List Mode or Advanced Sequence Editor, set the following:
- Start Frequency \(f_{start}\): 50.0 Hz
- ROCOF Slope \(df/dt\): 1.0–2.0 Hz/s (per standard)
- End Frequency \(f_{stop}\): 52.0 Hz
Execute the ramp sequence and monitor the EUT
Execute the sequence. The Grid Simulator performs a linear frequency shift. Monitor the EUT’s output current; under IEEE 1547, the EUT should trip only when the frequency/time threshold is exceeded.
Ensure safe disconnection and recovery per grid codes
The system captures the moment the EUT disconnects. Time to Trip is calculated automatically. Ensure the SAS clamps the DC voltage to prevent OVP damage. Reset the Grid Simulator to nominal frequency and verify EUT reconnection as required by applicable grid codes.
CORTEX AC programmable power supply is available in high-frequency version offering a maximum of 5000 Hz bandwidth and additionally with integrated power amplified for PHIL ROCOF testing for renewable energy systems.
Advantages for ROCOF Testing Application


ActionPower’s TITAN Series delivers industry-leading AC emulation optimized for ROCOF (Rate-of-Change-of-Frequency) testing, crucial for grid-tied inverters, ESS, and microgrid validation. Its tower-type architecture provides 1MVA single-unit output with ultra-fast dynamic response. TITAN scales to 10MVA without compromising control bandwidth, enabling precise emulation of severe grid disturbances, frequency ramps, and FRT events with over 94% energy efficiency.
Key Features for ROCOF Compliance
Discover TITAN Grid Simulator Discover TITAN AC Load Simulator
Specification-matching testing and simulation solutions need discussion of both parties. Actionpower welcomes you inquiry to study together with us about how we can automate your testing processes.
Send InquiryThese are the upcoming events and places you can find ACTIONPOWER and talk with us face-to-face!
Check EventsProfessionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?