Application Use Jun 16, 2026
How to Conduct ITIC Curve Test with Grid Simulators for AI Servers?
How to Conduct ITIC Test for AI Servers? Discover how ActionPower's grid simulators replicate voltage thresholds as per...

In-laboratory or manufacturing end-of-line testing for energy storage battery lays down its foundation regarding safety, reliability, and resilience once launched for either residential or commercial and industrial deployment. The battery life cycle testing thus for BESS (battery energy storage system) determines long-term durability, however, it does not actually consume an entire storage container's lifespan though by using scalable cell and module-level automation via automated testing equipment.
Automated systems such as battery cyclers execute repeated CC-CV charge (to voltage limit, then ≤0.05C cutoff), 20-60min rest, and CC discharge cycles, monitoring capacity fade to 80% SOH or 97% threshold. Partial SOC windows (80-100% accelerated or 0-100% full) simulate real workloads efficiently, aligning with IEC 62619/UL 1973 - completing 300-2000 cycles in weeks.
Automated testing equipment is thus the cost-effective and time-saving option for such a time-during application where constant tracking and calibration of specifications such as SOH, efficiency, ripple, ΔT, and impedance should be conducted.
The testing models extrapolate partial data to full life (e.g., LiFePO4 >10,000 cycles at >80% retention), using <1% of field capacity, cell tests cost $10k vs. $1M+ containers, which is another advantage of automated battery life cycle testing equipment.
Repeated CC charge to voltage limit, CV to ≤0.05C cutoff, 20-60min rest, CC discharge.
Tracks capacity degradation to 80% SOH or 97% threshold automatically.
80-100% accelerated or 0-100% full simulation, 300-2000 cycles in weeks.
Automated SOH, efficiency, ripple, ΔT, impedance calibration every 50 cycles.
Models predict full life (LiFePO4 >10,000 cycles) from partial test data.
Cell tests $10k vs $1M+ containers, uses <1% field capacity.
The BTS Battery Pack Charge-Discharge Test System (Battery Cycler) by ActionPower is a comprehensive solution designed for performance verification of power and energy storage battery packs per industry standards. Featuring bidirectional energy flow power supplies and advanced control software, it enables precise CC-CV cycling, cycle life testing, and BMS integration for automotive and BESS applications.

| Test Type | Description | Standards Coverage |
|---|---|---|
| Cycle Life Testing | CC-CV cycling to 80% SOH retention | IEC 62619, GB/T 31484, UL 1973 |
| Capacity Testing | 1C charge-discharge calibration, 3-repeat verification | GB/T 31486, IEC 62133-2 |
| Rate Capability | 0.5C/1C/3C/5C multi-rate performance | IEC 62619, GB/T 31467 |
| DCIR Testing | SOC-dependent internal resistance measurement | GB/T 31486, UL 1973 |
| BMS Following | CAN/RS485 protocol current/voltage tracking | GB/T 34658, UL 1973 |
| Consistency Check | Cell voltage/temp deviation, SOC balancing | IEC 62619, GB/T 36276 |
| Profile Simulation | WLTP/NEDC/HPPC real-world duty cycles | GB/T 31467, IEC 62619 |
| Safety Abuse Tests | Overcharge, short-circuit, thermal shock | GB/T 31467.3, UL 9540A, UN 38.3 |
| Standard | Test Items | Key Requirements |
|---|---|---|
| IEC 62619:2022 | Cycle Life, Abuse, Safety | 500+ cycles ≥80% capacity, electrical/mechanical/thermal abuse |
| EN 50549-1 | Grid Integration | BESS grid code compliance testing |
| Standard | Test Items | Key Requirements |
|---|---|---|
| UL 1973 | Construction, Performance | Electrical/mechanical/environmental tests, EMC verification |
| UL 9540A | Thermal Runaway | Fire propagation testing for full BESS systems |
| NFPA 855 | Energy Storage Safety | Installation and spacing requirements |
| Standard | Test Items | Key Requirements |
|---|---|---|
| GB/T 36276-2018 | ESS Battery | ≥300 cycles capacity <60%, 2000 cycles ≥70% retention |
| GB/T 31484-2015 | Cycle Life | High/low temperature cycle life evaluation |
| GB/T 31467.3-2015 | Safety | Overcharge, short circuit, thermal shock tests |
| Standard | Test Items | Key Requirements |
|---|---|---|
| UN 38.3 | Transportation Safety | T1-T8 tests: altitude, thermal, vibration, shock, etc. |
| IEC 62133-2 | Secondary Cells | Continuous charge, vibration, 250 cycles testing |
Specification-matching testing and simulation solutions need discussion of both parties. Actionpower welcomes you inquiry to study together with us about how we can automate your testing processes.
Send InquiryThese are the upcoming events and places you can find ACTIONPOWER and talk with us face-to-face!
Check EventsProfessionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?