Grid Interconnection Testing for SST (Solid State Transformer) as Associated Power System Interface of ESS-Integrated AI Data Center

PUE (Power Usage Effectiveness) is the underlying very specification that contributes to the innovations in architectural development for AI Data Center.

From UPS-backed topology prevailing nowadays to the HVDC structure which is re-shaping the industry and towards the futuristic SST (Solid State Transformer) integrated one, the only ambition that data centers follow with these changes is to utilize the utility power as maximum as possible at the load side of GPU clusters.

This application note covers the architectural evolvements of AI Data Center and extends to topic to SST as the power interface between grid and the server side, accordingly then to study how grid interaction standards may apply regarding their testing and validation.

Version1.0.0
Categories AI Server
Download Download Application Note
Download Count 3
Page Views 688
Size 1.12 MB
Create Date04/09/2026
Last Updated04/11/2026
AuthorZhiwei Bao
ReviewedSen Wang

Energy efficiency is the inevitable concern that overrides primarily other factors when it comes to building an AI facility. Training, testing and serving, the functioning of AI GPU cluster undergoes through its lifecycle featured by shifting electrical characteristics, extreme power volatility and high magnitude during peak load.

The underlying metric of PUE (Power Usage Effectiveness) is the reason for which AI data centers are being redesigned in their architecture. To summarize, the ultimate goals are keeping the numbers of power stage as few as possible so that less power are lost during conversions [1] and that the GPU cluster consumes as much as possible the power fed to the facility. Further with the integration of renewable energy sources such as PV and BESS, AI server data center is locally formed into a micro-grid, either of DC-bus or AC-bus, dependent on its architecture, and considered a DER that connected to local grid through power system interfaces. As a result, data center is no longer any kind of systematically standalone facility, but something subject to compliance to grid interoperability standards and codes.

Growing Server Rack Power Rating is Forcing Architecture to Take Transformation

Staring by citing the article of Qishan Pan, a community member at Infineon [2], the computing power of data center is no longer the same as that of the web 2.0 age.

Nevertheless, data centers are experiencing a massive surge in power demand. Compared to 2022, when GPUs consumed around 0.4kW and a single rack reached only 60kW, current GPUs in 2026 draw 2-4kW each, pushing rack-level power to 1MW.

Explosive growth chart of GPU and server rack power consumption from 2022 to 2030, showing server rack power rising from under 60 kW in 2022 to 600 kW - 1 MW projected by 2030.
Fig 1. The Growing Power Demand of Processors (xPUs) and Server Rack for Data Center

Meanwhile that the UPS as the power interface against MVAC local utility is still a prevailing option or AI data center facility, the growing power rating towards 1MW has led to two primarily concerns by which the transition of architecture is no longer a topic of the future.

Stage Losses along the Architecture Scale Correspondingly as Rack Power Grows

The LVAC-UPS-supported was inherited from the age of web 2.0, while applied to AI data center it still relies on a multi-stage AC-to-DC conversion chain to convert the grid AC down to the voltage that fits the demands of server PSU before the latter backs the functioning of GPUs.

The topology below demonstrates the power stages followed where utility AC is converted to 54 VDC along the data center. Tracing the power path from the LV MSB to the Rack PSU in the diagram, we can map out the typical operational efficiency \(\eta\) of each tier under full load, supposing that it is a 1MW server rack:

  • LV MSB to LVAC UPS (Distribution & Rectification): Double-conversion AC-to-DC-to-AC systems operate at an efficiency of approximately \(\eta_1 = 94.5\%\).
  • PDU (Distribution Transformer): Step-down transformation introduces minor core and copper losses, averaging \(\eta_2 = 98.0\%\).
  • AC Distribution to Compute Rack PSU \(415\text{ VAC}\) to \(54\text{ VDC}\): The server-level power supply unit rectifies and steps down AC to low-voltage DC with an efficiency of \(\eta_3 = 96.0\%\).

The cumulative end-to-end efficiency \(\eta_{total}\) of this traditional chain is calculated as the product of all individual stage efficiencies:

$$\eta_{total} = \eta_1 \times \eta_2 \times \eta_3 = 0.945 \times 0.980 \times 0.960 \approx 0.889 \text{ (or } 88.9\% \text{)}$$

To deliver a net compute power of \(1,000\text{ kW}\) \(1\text{ MW}\) to the AI compute rack, the total power that must be drawn from the upstream grid \(P_{input}\) is:

$$P_{input} = \frac{P_{rack}}{\eta_{total}} = \frac{1,000\text{ kW}}{0.889} \approx 1,125\text{ kW}$$

Consequently, the absolute power lost as heat across these intermediate conversion stages \(P_{loss}\) is:

$$P_{loss} = P_{input} – P_{rack} = 1,125\text{ kW} – 1,000\text{ kW} = 125\text{ kW}$$

A power distribution flow diagram labeled '415 VAC Distribution - Today'. The path originates from a utility source and optional on-premises generator, passes through the medium-voltage (MV) network, a 13.8–35k VAC step-down, the low-voltage main switchboard (LV MSB) with an optional diesel generator, an LVAC UPS supplying 480 VAC, a PDU, an AC distribution block delivering 415 VAC, an optional energy storage system, and terminates at a compute rack containing a 415 VAC power supply unit (PSU) and 54 VDC components.
Fig 2. 415 VAC Distribution AI Server Data Center Architecture Today with LVAC UPS

The \(P_{loss}\) stands for the energy which is totally burned off as heat along the distribution and stages across the UPS, PDU, and rack PSUs, almost equivalent to running an additional high-density server rack completely dedicated to generating thermal waste.

Respectively the facility has to implement cooling devices for handling the heat. Yet this proposes further energy consumption for load at the HVAC and cooling. For example, supposing a cooling system operates at a Coefficient of Performance (COP) [3] of 3.0, removing the conversion heat demands an extra \(41.7\text{ kW}\) of auxiliary power.

In LV Architectures for MW Racks, Current Scales and Physical Constraints Surface

Another of the noting downsides of grading down LVAC power from UPS to the rack  at 48 VDC (or even 12 VDC in older designs) is the current issues. It is easy to figure out the reason by solving with Ohm’s law, supposing a 1MW rack backed by 415 VAC Distribution :

$$I = \frac{P}{V} = \frac{1,000,000\text{ W}}{48\text{ V}} \approx 20,833\text{ A}$$

Respectively to prevent these busbars from melting due to resistive heating \(I^2R losses\), the cross-sectional area of the copper must be dramatically increased. As noted by NVIDIA, a single 1MW rack can require up to 200 kg of copper busbar [1], suggesting an exponential CapEx increase and especially when the data center scales up, for example, to a 1-Gigawatt facility.

HVDC and SST-Backed Architecture Transfers AI Data Center Brinds 800VDC Directly to Server Rack

With above concerns bore in mind, the future data center architecture design then focusses on two facts which are eliminating power conversion stages as possible and maintaining high voltage when the supply down to the load side of server rack. [4]

Current hybrid architectures utilize 800VDC server racks. Prior to reaching the rack, upstream stages step the utility MVAC down to LVAC and rectify it into an 800VDC distribution link. Now that higher voltage is supplied towards the server side, current demand is reduced and thanks to which resistive loses are reduced with power transfer more efficient.

An architectural power flow diagram labeled '800 VDC Distribution - Hybrid Power Distribution'. The layout shows input sources including Utility, an On-Prem Gen, and a Battery Energy Storage System (BESS) feeding into an MV Network. Power passes through a 13.8–35k VAC step-down to an LV MSB, outputs at 480 VAC to an LV Rectifier, converts to 800 VDC through a DC Distribution block with local energy storage, and finally delivers 800 VDC power to compute racks equipped with an 800 VDC PSU and 54 VDC components or direct 800 VDC racks.
Fig 3. Transitional HVDC Architecture with 800 VDC Server Rack

While the hybrid model improves efficiency and effectiveness, it still relies on stepping down the 13.8–35kVAC network to 480VAC before rectifying it to DC. To completely eliminate these redundant low-voltage converters and rectifiers, the ideal architecture must convert MVAC directly to 800VDC, which is what exactly the industry has been envisioning.

An architectural power flow diagram labeled '800 VDC Distribution - MV to 800 VDC'. The layout displays input sources including Utility, an On-Prem Gen, and a Battery Energy Storage System (BESS) feeding into an MV Network. Power then passes through 13.8–35k VAC into an MV Rectifier or Solid State Transformer, converts directly to 800 VDC, flows through a DC Distribution block with local Energy Storage, and finally supplies 800 VDC power to compute racks.
Fig 4. SST Integrated Data Center Stepping MVAC Directly Down to 800VAC

The discovery of SST’s potential match to the concerns around AI server data center is not a coincidence. The pursuit after a “high-frequency link converter” traces long back to half a century ago, and it is only until the commercialization of wideband gap semiconductors, specifically Silicon Carbide (SiC) MOSFETs that high-power SSTs was finally made a reality. [5]

Evolving from Simply a Data Center into a DC-Bus Micro-Grid with SST as Power Interface

Further to prevent the data center from downtime or shutdown due to the grid being the single source counted on, the facility can be integrated as well with renewable energy sources such as solar farms, fuel cells, and even with a BESS, which can store energy for the facility to ride through potential grid outages.

The main bus maintained by the SST that supports the server cluster ideally becomes one that matches the native DC output from these renewable sources. By keeping the power in the form of DC and avoiding the integration of inverters – which would further trigger energy losses – it forms a DC-bus based micro-grid that, in turn, can either support the utility grid or feed the server data center’s operations.

An architectural schematic labeled 'Hybrid DC-Bus Micro-Grid for Data Center with 1MW Rack'. The layout shows a 1500VDC or higher DC bus connecting external renewable sources and DC components via DC-DC converters, linked to a 3-phase AC utility grid through a Solid-State Transformer (acting in place of an MV/LVAC transformer) and a Solid-State Circuit Breaker. Inside the enclosed IT racks, power steps down sequentially through DC-DC stages from an 800 VDC bus to 48 VDC, 12 VDC, and finally down to Vcore (0.8 VDC). A legend at the bottom distinguishes between blue AC cables and red DC cables.
Fig 5. AI Server Data Center Integrated with Renewable Energy Sources and Backed by SST – Forming a DC-Bus Micro-Grid

SST as Power System Interface in Relation to Grid Interconnection Standards and Testing Applications

Once at facility level the data center is integrated with solar farm and especially BESS to either support the server side operation or in turn to inter-operate with the grid, the feature of bi-directional flow turns the whole facility into a micro-grid based on DC-bus and then categorized as DERs defined by IEEE 1547-2018 [6], with SST respectively falling into the category of power system interface.

The OCP Solid-State Transformer (SST) Specification officially states in its scope of application that a Medium Voltage Solid-State Transformer (MVSST) is defined as a megawatt-scale power electronic converter, which when coupled with energy storage could function as a Medium Voltage Uninterruptible Power Supply (MV-UPS). Beyond basic transformation, the SST provides advanced grid-interactive capabilities such as programmable MVAC response compliant with evolving grid codes. [7]

Open Computer SST Design Specification
Fig 6. OCP Solid-State Transformer (SST) Specification

Consequently, the upstream MVAC interface of the SST serves as the critical boundary where applicable grid code compliance testing must be conducted, while simultaneously validating the dynamic response of the coupled LVDC-ESS side. That is, in the context of testing with programmable power, simulating utility with a grid simulator while a battery simulator being tied to the SST’s LVDC-bus for replicating ESS behaviour.

An architectural test and simulation flow diagram. On the left, a Utility Grid connects regeneratively to a Grid Simulator, outputting 380 VAC through switchgear to a containerized Solid-State Transformer operating at 10-33kVAC. The system then branches into an 800V ESS Battery Simulator and an 800V Server DC Load Simulator, both featuring bidirectional regenerative connections back to the utility grid.
Fig 7. Testing Topology Demonstrating ActionPower’s Solutions for SST from MVAC and HVDC-Bus

Currently, grid code testing for SST in the context of serving micro-grid while integrated with ESS serving as voltage source has not seen a unified standard, given the fact that the approach to SST as power interface is still at the stage of being a prototype pending commercialization.

Applicable testing regulations and standards that can be referred to for the moment are IEEE 1547 (DER Reference), IEEE 2800 (DER at transmission level), ITIC (classic PSU ride-through), and among others, MISO and those by other utility authorities. For specific testing applications, engineers must adapt the relevant clauses from each of these respective standards.

Voltage Ride Through Capability Testing for SST as Power Interface of DC-Bus Micro-Grid

The OCP SST Design Specification refers to ERCDT graph for defining the SST’s capability of voltage ride-through [8]. In essence, it is as well at test engineer’s discretion which specific criteria to adopt for their application. Regarding the equipment and hardware, the testing setup requires accordingly a grid simulator with voltage stepping function that inject anomalies to SST’s MVAC-bus meanwhile that an ESS battery simulator reproduces either current-source or voltage-source behaviour different transient context.

  • Over-Voltage Ride-Through (1.1 pu < x ≤ 1.2 pu): When the SST experiences an input voltage above its nominal value, the interface must dynamically draw proportionally less current from the utility grid to maintain a constant 100% rated power output to the AI servers.
  • Acceptable Power Quality Range (0.9 pu ≤ x ≤ 1.1 pu for continuous operation ∞): Within this nominal voltage range, the SST must remain fully functional and continuously supply 100% of the rated output load without any time constraints.
  • In Low Voltage Ride-Through range (0.5 pu < x < 0.9 pu): When utility voltage drops within this range while the SST must supply 100% of the rated output load, the coupled ESS functions as a current source to sustain the operation. This prevents the SST from drawing current far beyond its nominal rating, avoiding potential system damage.
  • In worse Low Voltage Ride-Through range (x < 0.5 pu): Maintaining the SST as the voltage source to withstand such anomalies is no longer safe, as the input current would surge far beyond the nominal rating. The SST must detect the condition and draw no input current, leaving the coupled ESS to function as the sole voltage source for the system.

Voltage Ride-Through Requirements for SST - Grid compliance and ride-through performance chart. The y-axis shows the percentage of nominal AC voltage from 0 to 250 percent, and the x-axis shows AC cycles count from 10^-3 to 10^4 using a logarithmic scale. Curves compare multiple standards—ERCOT, FINGRID, ITIC, IEEE1547, and IEEE2800—annotated with operational zones for solid-state transformers (SST), including full capacity functional ranges, LVRT range #1, LVRT range #2 requiring internal energy storage ride-through, and regions requiring data center architecture actions.
Fig 8. SST and ESS Operational Transitions during Transient Grid Events.
The Shaded Regions Define the Critical Ride-Through Limits (LVRT Range #1 and #2)
before Intentional Islanding or Facility-Level Actions are Required

Anti-Islanding Test Capability for SST in the Event of Grid Outage

Anti-islanding testing is not among the criteria stated in the OCP SST Design Specifications, however, its implementation is inevitable. Once the SST acts as the facility-level power interface connected to the utility grid, especially with an integrated ESS, the deployment becomes strictly subject to authority interconnection requirements such as IEEE and FERC.

An architectural test and simulation flow diagram. On the left, a Utility Grid connects regeneratively to a Grid Simulator with Integrated RLC Modelling controlled by a laptop, outputting 380 VAC through switchgear to a containerized Solid-State Transformer operating at 10-33kVAC. The system then links to an 800V ESS Battery Simulator, which features a bidirectional regenerative connection back to the utility grid.
Fig 9. System-Level Testing Topology for SST Grid-Code Compliance
Utilizing Grid Simulator with Integrated RLC Modelling and ESS Battery Simulator

Another of ActionPower’s application note introduces technically to detail the definition and application anti-islanding test for inverters and PCS, which are defined as well as power system interfaces for DERs, according to IEEE and UL.

Read the Application Note

Dynamic Server Load Capability Testing in Coupling with Grid Simulator

In the strictest sense, dynamic load transient testing does not constitute a specific conformance test under IEEE 1547, which primarily addresses the interconnection and interoperability of distributed energy resources (DERs) with electric power systems. Nevertheless, an SST serving a data center or microgrid should possess sufficient transient response, overload capability, and control robustness to accommodate rapid and large step changes in load demand.

If such load transients are not adequately managed, they may result in excessive voltage deviations, degraded power quality, DC-link disturbances, or unintended activation of system protection mechanisms.

An architectural test and simulation flow diagram. On the left, a Utility Grid connects regeneratively to a Grid Simulator, outputting 380 VAC through switchgear to a containerized Solid-State Transformer operating at 10-33kVAC. The system then links to a Server DC Load Simulator operating at 800V, which features a bidirectional regenerative connection back to the utility grid.
Fig 10. Standalone Dynamic Load Testing Topology. The SST is Directly Subjected to
Extreme AI Server Load Transients via the DC Load Simulator without ESS Buffering
Validating its Internal Control Bandwidth and Bare-metal Resilience

ActionPower’s Utility-Scale Programmable Power for AI-Data-Center-Purposed SST

To accelerate the implementation of MW-level server racks and foster surrounding power systems where the SST stands out as a key breakthrough, ActionPower provides a robust portfolio of utility-scale testing solutions. We stand ready to address your SST testing requirements, covering both grid-side compliance and 800VDC load simulation – to thoroughly validate system robustness against extreme GPU workload transients.

Regenerative Grid Simulators

Various models of high-power grid simulators match the testing requirements for SST from its MVAC-bus through our additional solutions of integrated voltage-stepping function, with power capability spanning up to 10MVA, capable of replicating complex medium-voltage AC grid abnormalities, deep LVRT profiles, and real-time resonant RLC behaviors to ensure strict adherence to international utility standards like IEEE 1547.


Tailored for Solid-State Transformers (SSTs) and grid-interface testing in AI Data Centers (AIDC), the TITAN series delivers scalable power from 300 kVA to 1 MVA per cabinet and scales up to 10 MVA total capacity. It expertly replicates complex medium-voltage grid abnormalities, deep LVRT profiles, and real-time resonant RLC behaviors for strict IEEE 1547 compliance.

Discover TITAN Regenerative Grid Simulator

Front view of ActionPower TITAN regenerative grid simulator cabinets on a blue technology-themed background, engineered for SST-enabled AIDC testing up to 10 MVA with advanced LVRT and anti-islanding simulation capabilities.

 

AI Server DC Load Simulators

Purpose-built to subject the 800V DC bus to authentic, worst-case GPU workload transients, verifying bare-metal control bandwidth, DC-link capacitance margins, and overall system resilience without requiring immediate physical infrastructure. For more information, check PRL High-Dynamic DC Load Simulator.


Regenerative DC Load accommodating high dynamics and fast response that aligns with the complex and shifting emulation requirements for data-center-related load testing. PRL scales up from a single 5U/25kW to 1.4MW high-power testing platform with 8 cabinets in parallel connection while offering regenerative load capability of up to 85% to save your testing energy cost.

Check PRL DC Load Simulator

actionpower launches PRL DC load simulator - Product launch banner for the ActionPower PRL Regenerative & High-Dynamic DC Load Simulator. The graphic showcases two black industrial rack cabinets: a taller unit on the left configured with seven 25kW 5U modules in parallel, and a shorter unit on the right configured with four 25kW modules.

For further information about our technical approach to grid compliance testing, you may either submit a contact form or reach out to our field application team by sending an email.

Bibliography

  • [1] Data Centers Are Transitioning From AC to DC 800-volt DC power delivery will enable next-gen AI data centers, IEEE Spectrum, Drew Robb, Mar 24, 2026, Link
  • [2] 800V AI服务器机柜的DC/DC电源架构, Infeneon, Qishan Pan, ‎27 May 2026, Link
  • [3] Coefficient of performance, Energy Education, Link
  • [4] NVIDIA 800 VDC Architecture, Power Delivery for the AI Servers and Factories of the Future, NVIDIA, Link
  • [5] Solid-State Transformers Emerge for Next-Gen AI Data Centers, ET Datacenters, Sep 01, 2026, Link
  • [6] IEEE 1547-2018, IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces, Link
  • [7] Solid State Transformer (SST) Specification, Revision 0.3.0, Specification Effective, 6/22/2026, Author: Google, Microsoft, Nvidia, Link
    Medium Voltage to 800 VDC Power Conversion Platform
  • [8] Texas PUC approves ‘ride-through’ rules for data centers, Utility Dive, Diana DiGangi, uly 13, 2026, Link
  • [9] Sina Mohammadi, Wayne Wang, Marcus Chen I Wada, Rouzbeh Haghighi, Ali Hassan, Hualong Liu, Archit Bhatnagar, Ang Chen, Wencong Su, Grid integration of AI data centers: A critical review of energy storage solutions, Advances in Applied Energy, Volume 23, 2026, 100291, ISSN 2666-7924, Link

 


Zhiwei Bao 鲍智威, with Wikidadata entry www.wikidata.org/wiki/Q141170017, is an SEO Engineer at ActionPower, Technical Copywriter for Power Electronics and Grid Compliance | Zhiwei Bao is also owner of ÉLITER Packaging Machinery, as mechanical engineer and inventor, holding more than 20 patents
About the Author

Zhiwei Bao

Industrial Automation Power Electronics Product Marketing Field Application

Zhiwei Bao holds 20+ patents in the field of mechanical engineering and is keen on industrial automation and product marketing. His interdisciplinary background, along with his passion and initiative for learning, has led him to a profound understanding of power electronics. He manages the technical copywriting for programmable power and testing topics at ActionPower through product-marketing-driven approaches.

About Zhiwei Bao
Quick Model Access

Smart Discovery

Access our Power Supply Wizard to find the right programmable power supply for your use cases and testing scenarios.

discover programmable power supply by filtering with current, voltage and power ranges