Home Contact EN

Islanding Prevention Test of Utility-Interconnected Photovoltaic Inverters as per IEC 62116 with ActionPower’s MW/MVA PV & Grid Simulators

Validating Islanding prevention capability is critical especially for grid-following inverters against unintentional islanding during real deployment for their operation pattern as current source rather than voltage source - as they rely on external voltage and frequency as benchmarking.

A range of international and regional standards and regulations are complied for photovoltaic inverters in grid-interconnected operating conditions where anti-islanding test is included among one of the most essential validation procedures. The present application note narrows down to IEC 62116 which is exclusively developed for such testing again grid-interconnected photovoltaic inverters, and to be more specific, the application for those high-power MW inverters with PV system tied at the upstream of generation source.

Version1.0.0
Categories Inverter Testing
Download Download Application Note
Download Count 2
Page Views 236
Size 827.83 KB
Create Date12/10/2026
Last Updated04/11/2026
AuthorZhiwei Bao
ReviewedSen Wang

Inverters functioning as the gateway between energy source generated from photovoltaics system and grid side serve as well as key conversion stage for those loca loads among the island. Being grid-and-utility-interconnected devices means they are electrical components and power conversion systems subject to grid-side interruptions and impacts, among which, one of the most important events is unintentional islanding.

Worldwide, various standards have established prevention measures, validation guidelines, and applicable specifications for anti-islanding. These standards either focus exclusively on islanding prevention or incorporate it as a subset of comprehensive grid code testing. IEC 62116:2014, the latest internationally recognized procedure, specifies the exact testing items and technical criteria for validating utility-interactive PV inverters. Furthermore, its methodology can be extended to cover other types of utility-interconnected generation systems (microturbine and fuel cells, induction and synchronous machines, i.e.). [1]

IEC 62116 2014 Utility-Interconnected Photovoltaic Inverters
Fig 1. IEC 62116:2014 Utility-Interconnected Photovoltaic Inverters – Test procedure of Islanding Prevention Measures

Technical Overview and Application Scope of IEC 62116

Defining the scope of application is the first step to decide in which contexts those testing measures contained in IEC 62116 can be adopted, though the document specifically addresses PV inverters. In the introduction section of IEC 62116:2014, the official statements clarify that:

“The setup and procedure may also be used to evaluate inverters used with other generation sources or to evaluate separate anti-islanding devices intended for use in conjunction with PV inverters or other generation sources acting as or supplementing the antiislanding feature of those sources.” [2]

Consequently, the EUT subject to IEC 62116 compliance may include the following devices, and for each device type, a specific testing topology setup is suggested by the application note:

Grid-Following & Grid-Forming PV Inverters

Grid-following inverters (GFLs) are highly vulnerable to utility outages due to the loss of their required voltage and frequency references. In worst-case scenarios, a perfect match between local generation and load demand (both active and reactive power) creates a Non-Detection Zone (NDZ). Within this NDZ, the GFL fails to detect the grid loss and unintentionally continues to energize the islanded network. The situation is referred to as unintentional islanding, against which the IEC 62116 applies for validating the inverter’s prevention capability.

Similarly, grid-forming inverters (GFM), while with operational capability of working as a voltage source, are also subject to the specifications imposed by IEC 62116 for reasons that the intentional islanding they can create does not waiver their protection requirements against unintentional ones.

string inverter testing topology
Fig 2. Testing Topology with CORTEX AC and PV Simulators for String PV Inverters

One of ActionPower’s technical article talks about the technical differences between grid-following inverters (GFLs) and grid-forming inverters (GFM). Read the article.

Power Conversion System (PCS)

Power conversion system is actually a terminology that has inverters within its scope, though a standard inverter and a PCS are not exactly the same thing.

IEC 62116 applies specifically for BESS which comes with integrated PCS for interconnecting the same with the utility, usually functioning as a grid-following bidirectional current source and relies on the utility’s voltage and frequency as its synchronization benchmark.

The same testing measurement is applicable for grid-forming PCS, note that they are also subject to unintentional islanding conditions during operation, despite their capability of supporting the island with grid-forming capability.

Testing System Topology Power Conversion System (PCS)
Fig 2. Testing Topology for Power Conversion Systems PCS with BESS Simulator and Four-Quadrant Grid Simulator

Inverters in Conjunction with PCS-Integrated BESS

IEC 62116 clearly states in the scope section that it applies to supplementary islanding protection devices operating in conjunction with other generation sources. In a more complex AC-bus microgrid, for example, where both BESS and PV systems are integrated to support local loads and interconnect with the grid, the system faces a potential risk of conflicts between GFL and GFM modes due to the coupled dynamics within the microgrid.

During a grid outage in an AC-coupled system, the grid-forming PCS instantly sustains the local bus voltage and frequency, inadvertently deceiving the grid-following PV inverters into missing the grid loss. Consequently, validating the system as per IEC 62116 is essential to identify and eliminate the resulting superimposed NDZ a dynamic multi-device conflict that poses a critical threat to system-level grid safety.

local micro grid bus with PV and BESS system integrated
Fig 3. AC-Bus Micro-Grid with Multiple Inverters Tied to Main Bus

V2G Vehicle-to-Grid Systems

Although IEC 62116 primarily targets PV systems, the unintentional islanding mechanisms it addresses – where generation sources fail to detect grid outages and continue energizing local loads – are directly applicable to V2G (Vehicle-to-Grid) scenarios.

A bidirectional OBC or EV charger which feeds back the energy from EV’s battery into the grid without spotting that the grid is suffering from an outage actually aligns with the islanding context which happens to an inverter in PV system, so should they be validated accordingly for the prevention measurements.

Two exemplar V2G islanding testing topologies can be found in later chapter.

Testing Setup and Circuits Recommended by IEC 62116 for Islanding Reproduction

The standard specifies two distinct test circuits:

  • one for inverters with integrated anti-islanding functions,
  • and another for those relying on independent protection systems.

Both configurations utilize an RLC resonant load topology within the test setup. The only difference lies in where the islanding detection intelligence resides, how the disconnect control signal is routed, and where the boundary of the Equipment Under Test (EUT) is drawn.

A side-by-side comparison of two electrical schematic diagrams for anti-islanding test circuits. The left diagram displays a test circuit for a power conditioner (inverter), showing a DC power source (PV) connected to the EUT (inverter). The inverter connects to a central node that links to a waveform monitor, an AC load module (with adjustable parallel resistor, inductor, and capacitor) via switch S2, and a utility AC power source via switch S1. The right diagram illustrates a test circuit for an independent islanding detection device (relay). In this setup, the DC power source and inverter are combined into an 'AC input source' that feeds the EUT (relay), with a control feedback line returning to the inverter. The remainder of the circuit, including the waveform monitor, AC loads, utility source, and switches S1 and S2, is identical to the left diagram.
Fig 4. The Two Testing Circuits Proposed by IEC 62116 for Inverter with or without Integrated Islanding Functions

Tuning of Parallelled AC Loads as Key Procedure for Emulating Islanding Conditions

Both the testing setup circuit follows the same procedure for tuning the AC RLC loads for achieving a NDZ where zero current are fed to the AC power source that emulates utility grid.

In accordance with IEC 62116, Section 6.1, the testing procedure begins by establishing the fundamental power baseline. With the RLC AC load disconnected from the circuit, the fundamental active and reactive power flow is measured at the utility interface. The test engineer then tunes the resonant RLC circuit to target a quality factor of \(Q_f=1.0 \pm 0.05\). This is accomplished by adjusting the inductive and capacitive reactances to balance the reactive power, and tuning the resistance so that the active power consumed by the RLC circuit precisely matches the inverter’s active power output.

For the final closed-loop current zeroing, the configured RLC load is formally connected to the circuit. By continuously monitoring the fundamental AC current flowing through the utility disconnect switch (S1), the test engineer dynamically fine-tunes the R, L, and C components.

The objective is to reduce this steady-state fundamental current to exactly 0.0 A, adhering to a strict permissible tolerance of ±1% of the equipment’s rated current. [3]

$$
\begin{matrix}
\textbf{I. Baseline Measurement} & \longrightarrow & \textbf{II. Resonant Tuning} & \longrightarrow & \textbf{III. Closed-Loop Zeroing} & \longrightarrow & \textbf{IV. NDZ Achieved} \\
\text{RLC load disconnected} & & \text{Target } Q_f = 1.0 \pm 0.05 & & \text{Connect RLC to circuit} & & \text{Zero current fed to AC source} \\
\text{Measure } P_{AC}, Q_{AC} & & \text{Balance } L, C \text{ and tune } R & & \text{Fine-tune } R, L, C \text{ to } 0.0\text{A} & & \text{Tolerance } \le \pm1\%
\end{matrix}
$$

V2G Islanding Validation as per IEC 62116 with Technical Features Resembling that of Inverters

While most case studies on the market focus on the islanding validation of PV inverters exactly as what IEC 62116’s title addresses, the underlying functional and algorithmic features of islanding detection are analogous to those of bidirectional V2G chargers. It is thus worth extending the studies to cover the islanding test against V2G applications.

A test topology diagram for a V2G-AC system, featuring an ActionPower EV Battery Simulator on the far left connected via DC to a Bidirectional On-Board Charger (BOBC) and a V2G AC Charger. The AC output connects to a central node monitored by a Waveform Monitor, an RLC AC load bank via switch S2, and a Grid Simulator via main disconnect switch S1A test topology diagram for a V2G-DC system, showing an ActionPower EV Battery Simulator supplying direct current to a V2G Bidirectional Charger (acting as the EUT). The AC output side is integrated with a Waveform Monitor, an adjustable RLC AC load bank controlled by switch S2, and an ActionPower Grid Simulator connected through the main disconnect switch S1
Figure 5. IEC 62116 Islanding Test Topologies Comparing V2G-AC (left) and V2G-DC (right) Architectures Using ActionPower Equipment

The role assumed by either the V2G DC fast charger or the subsystem comprising the BOBC and AC charger is functionally identical to that of a power conversion interface – as defined in IEEE 1547  positioned between a DER-categorized charging station and the utility grid. This is the technical fact that legitimizes the equivalent application of IEC 62116 to these power systems.

When setting up the testing circuit for the two V2G circumstances:

  • Rather than implementing a PV array emulator as the DC source, V2G islanding prevention testing requires a battery simulator to replicate the dynamic current and voltage profiles of an EV battery. The primary difference lies in the emulation programming, although both of them share the same fundamental function of reproducing a DC power source (an EV battery simulator is bidirectional in power flow, however). 
  • Both V2G subsystem configurations are integrated into the IEC 62116 test circuit in the same manner as conventional PV inverters.
  • Tuning of RLC AC Loads for reaching the NDZ and the timing when S1 is disconnected from the grid simulator is the same as IEC 62116
  • The transient anti-islanding response of the V2G equipment is thus evaluated as the testing circuit captures the run-on time

The purpose of the testing remains identical to that of evaluating PV inverters: to measure how quickly the V2G subsystem detects an unintentional islanding event, responds to the anomaly, and disconnects from the local utility grid without damaging surrounding facilities.

Features of MW-Scale Utility-Connected Photovoltaic Inverters

IEC 62116 does not specify the power rating ranges of inverters as EUTs for the test setup, though, the metrics and electrical profiles are inevitably hitting higher power and voltage as the grid landscape grows more complex than ever with diverse DERs integrated (including BESS, PV and V2G systems), along with the integration of GFM inverters and PCS which typically scale to several MWs.

The islanding test and its circuit setup thus face corresponding challenges including the emulation and control of MW power profiles, and subsequently, the thermal management and technical approaches to efficiency control that come along with the scaled metrics.

Thermal Stress from RLC AC Loads is Incredibly Higher than Ever

The high power consumed by the AC loads for MW inverters during the IEC 62116 islanding test, especially at the NDZ with \(Q_f=1\) when full load is forced [4], is beyond question. However, a further concern in this context is the subsequent thermal drift resulting from such a high-power profile, which affects the testing circuit’s effectiveness.

Transient Extreme Profiles against DC Source and Grid Simulator at Disconnection

The moment S1 indicated in the proposed circuit by IEC 62116 is disconnected from the AC source triggers an extreme electrical profile at both the DC source emulation and grid emulation sides.

The grid simulator is supposed to maintain its \(V/F\) (voltage and frequency) profile intact from the impacts of transient open-circuits when islanding prevention is triggered along the circuit. The system should be immune to the potential overshoot caused by zero-crossing disconnection and free from unexpected overshoot protection tripping.

load rejection while voltage upsurge occures with overshoot to be surpressed for PV Simulator during IEC 62116 testing when S1 turns disconnected
Fig 6. PV Simulator Transient Waveforms during S1 Disconnection, Featuring the Extreme \(di/dt\) Drop and Subsequent Voltage Surge

The concerns apply equivalently to the DC source simulator (PV array simulator or EV battery simulator) given the facts that the sudden disconnection of utility switch will force a 100%-to-0% load rejection featuring extreme \(di/dt\) that may threats the safety of DC source with a significant surge voltage. (The resulting microsecond-level voltage surge that is supposed to be suppressed potentially goes destructively beyond 1,500 VDC for a 2 MW PV array simulator operating at 1,000 VDC at the moment of a 2,000 A load rejection.)

IEC 62116 Testing Setup with ActionPower’s MW DC Source Simulator and MVA Regenerative Grid Simulator

The conventional approach of setting up testing circuits by parallelling modular, rack-mount programmable power supplies struggles with exacerbated electrical profiles when scaling up to the multi-MW or MVA level – issues that are less concerning when testing residential and commercial inverters up to tens of kW.

ActionPower’s MW-scale testing platforms are therefore engineered to withstand these extreme stresses and prevent the compromised reliability inherent to such contexts

V/F Mode at Grid Side for Voltage Source Emulation

Four-quadrant grid simulators typically operate in V/F-controlled mode when deployed as the AC grid source in an IEC 62116 test circuit. While tuning the parallel RLC AC loads, the emulated grid, with which the inverter operates in grid-tied mode, must provide stable voltage and frequency as a voltage source to maintain the intended power balance and alignment between the supply frequency and the tuned RLC resonance.

This differs from contexts where a grid simulator with load-simulation capability operates in PQ mode, with controllable active and reactive power, to test a grid-forming inverter or PCS intended to supply local loads after disconnection from the grid. In this configuration, the inverter or PCS establishes the voltage and frequency, while the simulator acts as a controlled load. This evaluates standalone or intentional-island operation and is distinct from IEC 62116 anti-islanding testing.

ActionPower’s portfolio includes grid simulators with both voltage-source and PQ load-simulation capabilities to support these testing applications.

ActionPower’s grid simulator operating under PQ mode for validating GFM PCS. With an SCR of 3.6 and a virtual inductance of 2 mH, the converter operates stably, delivering a reactive power of 32 kvar.
Fig 7. GFM PCS response during testing with an ActionPower grid simulator.
Under the specified test conditions—an SCR of 3.6 and a virtual inductance of 2 mH,
the PCS maintains stable operation with a reactive-power output of approximately 32 kvar.
The highlighted interval shows its reactive-power response.

RLC-Load-Bank-Free and Regenerative Testing Setup

High-power grid simulators by ActionPower combines both regenerative four-quadrant operation with RLC emulation network that waiver the essentialness of implementing additional sets of physical RLC AC loads. The benefits with such a hardware-and-software enhanced architecture include the improved parameters controllability, as well as the elimination of interference and shifting resonant point caused by heat generated on if conducted on physical AC loads.

modern anti islanding test with integrated RLC load bank - System block diagram showing the testing architecture for EUT Inverters. On the left, ACTION-brand Grid Emulators are shown with icons representing Integrated RLC Modelling. Four connection lines pass through Relays (S1) and Relays (S3) to reach the central EUT Inverters block. On the right side, the inverters connect to ACTION-brand Solar/Battery Emulators.
Fig 8. Anti-Islanding Test Platform Setup for Inverters with RLC-Modelling Integrated Grid Emulator

More advantages about ActionPower’s solutions to IEEE 1547.1-2020 & UL 1741 SB with RLC network integrated islanding testing platform can be found by this application note.

One DC Source Platform with Battery and PV Emulation Integrated

Although IEC 62116 is developed for application to PV inverters, DERs system integrators do not necessarily work exclusively on BESS or solar farm project but may also engaged in charging station setup. For those who with a compound targeting market, implementing separates testing systems for PV inverter and V2G subsystems suggest considerable costs – given the fact that the differences are just at the DC source side of deploying a battery or PV simulator.

Both ActionPower’s TITAN DC and PRO20 DC Source Simulator respectively as tower-type and modular-based cabinets supporting the controlled power emeulation profile for EV battery and solar array from a single platform through smart software.

Discover More Inverter-Related Testing Applications and Solutions from ActionPower

Having partners with established renewable energy brands as well as those system integrators and 3rd party testing institutes for power conversion interfaces including Sungrow Power and TÜV SÜD, with offered solutions and testing platform covering power ranging hundreds of kW to 10+ MW and MVA, ActionPower has among our portfolio more advanced options of programmable power and emulation systems for fulfilling your testing applications against grid codes, standards and regulations.

More of our related notes about grid code compliance testing and realted applications like IEC 62116 can be found by:

Bibliography

  • [1] Energy Storage Systems Testing & Compliance, Bureau Veritas, Link
  • [2] IEC 62116:2014 © IEC 2014, International Electrotechnical Commission, Link
  • [3] Comparative Analysis of Anti-Islanding Requirements and Test Procedures in the United States and Japan, Abraham Ellis, SAND2013-4924C, Japan Electrical Safety & Environment Technological Laboratories, Link
  • [4] Performance Assessment of Active Frequency Drifting Islanding Detection Methods, L.A.C. Lopes, Huili Sun, IEEE, 31 March 2006, Link

 


Zhiwei Bao 鲍智威, with Wikidadata entry www.wikidata.org/wiki/Q141170017, is an SEO Engineer at ActionPower, Technical Copywriter for Power Electronics and Grid Compliance | Zhiwei Bao is also owner of ÉLITER Packaging Machinery, as mechanical engineer and inventor, holding more than 20 patents
About the Author

Zhiwei Bao

Industrial Automation Power Electronics Product Marketing Field Application

Zhiwei Bao holds 20+ patents in the field of mechanical engineering and is keen on industrial automation and product marketing. His interdisciplinary background, along with his passion and initiative for learning, has led him to a profound understanding of power electronics. He manages the technical copywriting for programmable power and testing topics at ActionPower through product-marketing-driven approaches.

About Zhiwei Bao
Quick Model Access

Smart Discovery

Access our Power Supply Wizard to find the right programmable power supply for your use cases and testing scenarios.

discover programmable power supply by filtering with current, voltage and power ranges
CONTACT US

Contact Us

Professionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?

Subscribe to Newsletter

Thank you for subscribing!