Anti-Islanding Test According to IEEE 1547.1-2020 / UL 1741 SB with RLC-Modelling Integrated Grid Simulators, Save Time and with Less Equipment to Manage

The modern power system is converting from a traditional power station monopolized panorama into a complex and sophisticated network of distributed energy resources (DERs) among which the interoperability stands out among the most concerned factors for maintaining the system stability for such a decentralized energy network.

One of ActionPower's technical articles discussed the differences between grid-forming and grid-following inverters yet did not extend the topic into a more in-depth analysis combining a specific grid code compliance testing scenario. For this session of application note, the focus will be about how advanced grid simulators, with integrated RLC emulation modelling, may streamline your testing application for these critical grid-connection devices against anti-islanding requirements as imposed by IEEE and UL standards.

Version1.0.0
Categories Grid Code
Download Download Application Note
Download Count 16
Page Views 6794
Size 803.17 KB
Create Date19/03/2026
Last Updated04/11/2026
AuthorZhiwei Bao
ReviewedSen Wang

Key Takeaways (for Test Engineers & Compliance Labs) before Reading

  • What IEEE 1547.1-2020 & UL 1741 SB require for anti-islanding tests (NDZ, Qf=2.5, 2s trip time).
  • Step-by-step workflow of conventional RLC load bank tests and where time & errors come from.
  • How RLC-modelling grid simulators replace physical RLC banks and cut 70–80% setup time.
  • How to choose between CORTEX, NEXUS, and TITAN grid simulators for your test lab.

Introduction to Interoperability and Grid Compliance of DERs

The role of Distributed Energy Resources (DERs) is shifting rapidly alongside the evolving power grid landscape, where energy generation is becoming increasingly decentralized.

As the penetration of solar PV and Energy Storage Systems (ESS) reaches unprecedented levels, grid stability has evolved from a localized concern into a systemic challenge – a shift which imposes rigorous requirements for the interoperability between DERs and the utility grid. Modern DERs are no longer merely required to disconnect passively during anomalies, however, they must now actively support the network in strict compliance with advanced grid codes.

For example, as one of the modern grid codes, California Rule 21 [1] now require inverters to stay connected during transient disturbances, which is a capability known as Grid Support or Ride-Through. What this shift implies is the transformation of DERs from passive components into active contributors to grid resilience.

System architecture diagram of an electrical network showing power flow between a main grid, battery, diesel generator, photovoltaic array, wind turbine, and EV load. The components are connected to a central electricity bus via AC/DC and DC/DC converters, with red arrows indicating the direction of power flow (PGrid, PLoad, Pbat, Ppv, Pwt, Pdg).
Fig 1. Exemplar Diagram of Modern Power Grid Landscape with Distributed Energy Resources

The Seemingly Conflicts between Grid-Supporting Interoperability and Anti-Islanding Protection

Anti-islanding is a protection function designed to detect an unintended islanding condition [2] and rapidly disconnect the inverter from the grid, while the enforcement of grid support functions have imposed a series of subtle but significant challenges. Here comes the conflicts as it seems to be:

  • Grid support functions require the inverter to ride through disturbances, remain stable and inject reactive power (Volt-Var), or adjust active power (Freq-Watt) to suppress grid fluctuations.
  • Anti-islanding requires the inverter to disconnect quickly when the grid is lost so that any unintentional island can be prevented,

Yet in reality they are not something that come with paradox – but rather it is about the detection boundary. Inverters must prove that the integrated anti-islanding algorithms are as smart as to distinguish between a transient grid disturbance and an actual loss-of-grid conditions for true islanding event. Here arises the terminology of Non-Detection Zone (NDZ) [3] – a region where voltage and frequency deviations are minimal despite the absence of the utility grid.

The Synergy and Interplay of IEEE 1547.1 and UL 1741 SB

A quick answer leading the below introduction is that:

  • IEEE 1547.1 is a measurement framework that provides testing methodologies but not a design guideline or interconnection agreement [4].
  • And UL 1741 SB serves as the certification framework for grid interconnection in North America

Compliance with IEEE 1547.1-2020-defined anti-islanding test procedures is a prerequisite for achieving UL 1741 SB certification. Without passing these rigorously defined RLC-based islanding tests, particularly under grid-support-enabled conditions, an inverter cannot meet the interconnection requirements of most North American utilities, or in other regions where IEEE and UL standards are recognized as the references.

A comparison chart for solar inverter standards. The UL 1741 section on the left includes its safety and certification points. The IEEE 1547 section on the right includes its grid interconnection and interoperability guidelines. Large captions below clearly label UL 1741 as a certification framework and IEEE 1547 as a test measure guideline.
Fig 2. UL 1741 is a Certification Framework while IEEE 1547 is a Test Measure Guideline

Technical Fundamentals to Anti-Islanding: How Does it Occur and Why Should it be Prevented?

To understand islanding, it is essential to explain the mechanisms by which these conditions occur for DERs in practical power systems.

Power Balance and Resonant Equilibrium

An unintentional islanding event occurs when a Distributed Energy Resource (DER) continues to energize a portion of the utility grid after it has been electrically separated from the utility grid. From a power systems perspective, the sustainability of an island depends on the Power Mismatch at the moment of disconnection (apart from load characteristics such as RLC resonance and quality factor, system impedance, and inverter control strategy). [5]

If the local load’s real power \(P_{load}\) and reactive power \(Q_{load}\) deviate significantly from the DER’s output \(P_{gen}\), \(Q_{gen}\), the resulting voltage and frequency transients will trigger conventional protection relays. However, the most critical condition occurs during a Balanced Load State, defined by:

$$\Delta P = P_{gen} – P_{load} \approx 0$$
$$\Delta Q = Q_{gen} – Q_{load} \approx 0$$

In this equilibrium, the voltage magnitude \(V\) and system frequency \(f\) remain within nominal operating windows, effectively neutralizing the detection capabilities of standard \(\text{Under/Over Voltage (UV/OV)}\) and \(\text{Under/Over Frequency (UF/OF)}\) protection schemes.

The Non-Detection Zone (NDZ) and Quality Factor

The Non-Detection Zone (NDZ) is defined as the range of power mismatches \(\Delta P, \Delta Q\) within which an anti-islanding algorithm fails to detect a grid disconnection within the mandatory 2.0-second threshold (IEEE 1547.1 specifies that DERs must cease to energize the grid within 2 seconds following the formation of an unintentional island).

To validate the efficacy of active anti-islanding measures—such as Active Frequency Drift (AFD) or Sandia Frequency Shift (SFS)—IEEE 1547.1-2020 mandates the use of a high-precision resonant RLC load. The difficulty of detection is mathematically dictated by the Quality Factor \(Q_f\):

$$Q_f = R \sqrt{\frac{C}{L}}$$

A higher \(Q_f\) indicates a steeper phase-frequency slope \(d\phi/df\) at the resonant frequency. In a high-\(Q\) environment \(Q_f = 2.5\) per IEEE 1547.1), the resonant circuit exhibits high inertial characteristics that suppress the frequency perturbations introduced by the inverter’s active AI algorithms. Furthermore, the UL 1741 SB requirement for advanced grid-support functions – specifically Volt-Var and Volt-Watt – introduces an additional stabilization layer that compensates for voltage deviations, thereby further expanding the NDZ and challenging the inverter’s detection logic.

Prevention and Safety Concerns

The purposes that testing measures specified in IEEE is for enforcing the most difficult condition for inverter to spot the islanding thus to technically evaluate its capability of preventing potential risks. On the contrary, in the case that the inverter fails to spot the islanding condition and forces protection logic to operate, severe outcomes may occure as below:

  • Lethal hazard to Utility Personnel: Maintenance protocols assume that once a primary breaker is opened, the line is de-energized. An undetected island maintains the line at nominal voltage, creating a lethal hazard for utility crews performing repairs or restoring service.
  • Out-of-Phase Reclosing (OPR): If the utility’s Automatic Recloser (AR) operates while an islanded DER is still active, a significant phase angle displacement is likely between the two systems. The resulting reclosing event can induce transient torques and current surges that exceed the hardware design limits of the DER’s power stage and connected rotating machinery, leading to catastrophic equipment failure.

Conventional Approach to Anti-Islanding Test in Laboratory with Hardware-Based RLC Load Banks

The established procedure for verifying compliance with anti-islanding mandates involves the synthesis of a resonant load using discrete physical components. As illustrated in Figure 3, the test topology integrates a Resistive (R), Inductive (L), and Capacitive (C) load bank connected in parallel at the Point of Common Coupling (PCC), situated between the Grid Simulator and the Device Under Test (DUT).

System schematic showing the connection of ACTION-brand Grid Emulators (left) and Solar/Battery Emulators (right) to a central EUT Inverter via programmable Relays S1, S3, and S2. An adjustable, switchable three-phase RLC load bank is included, and a multi-channel Power Analyzer is connected for system-wide monitoring.
Fig 3. Conventional Anti-Islanding Test Platform Setup for Inverters with RLC Load Bank

Manual Tuning Procedure for Replicating Resonant Equilibrium

To evaluate the Non-Detection Zone (NDZ) in accordance with IEEE 1547.1-2020, the physical RLC network must be precisely tuned to achieve a resonant frequency \(f_o\) that coincides with the nominal grid frequency (typically \(50\text{Hz}\) or \(60\text{Hz}\). The procedural execution, referenced in Fig 3, follows a structured sequence:

  • Impedance Parameterization: Analytical determination of the specific Resistance (R), Inductance (L), and Capacitance (C) values required to satisfy the mandated Quality Factor \(Q_f = 2.5\) [6] and the active power equilibrium criteria where \(P_{gen} = P_{load}\).
  • Hardware Configuration via S2: Manual adjustment of the contactors and switchgear—designated as Relays (S2) in Figure 1—to engage the physical load branches. This step approximates the calculated reactive and resistive magnitudes necessary for resonance.
  • Balanced State Verification: With the Island Switch (S1) and DUT Switch (S3) closed, the operator utilizes a high-precision power analyzer to confirm that the net exchange of real and reactive power at the Point of Common Coupling (PCC) is minimized \(\Delta P \approx 0, \Delta Q \approx 0\). This ensures the Grid Emulator is providing negligible support, effectively “hiding” the grid from the DUT.
  • Disconnection Execution: The transition to an islanded state is initiated by opening Relays (S1). This action electrically isolates the Grid Emulator from the local network. The transient response and the subsequent “Time to Trip” of the EUT are recorded to verify that the cessation of power injection occurs within the 2.0-second regulatory limit.

Manual Tuning Error, Results with Error, Time-Consuming, and Cost of Ownership

The primary challenge lies in the management of complex hardware and the limited tuning resolution of conventional RLC load banks. Due to the discrete switching steps, precise reactive power matching is difficult to achieve, and any residual mismatch \( X_{\text{L}} \neq X_{\text{C}} \) may introduce unintended deviations – reults of which is the false detection and inaccurate representation of intended NDZ. Apart from the potential error of testing results, the multiple load banks themselves suggest significant total cost of ownership eventually for the laboratory.

Take advantage of ActionPower’s RLC Impedance Calculator to make your load bank tuning easier through a few of clicks.

Beyond the deviation of test results and concerns above-mentioned, engineer will struggle as well with the repetitive manual reconfiguration of Relays (S2) for each power setpoint (e.g., 25% to 100%) required by IEEE 1547.1-2020, with typically and estimated up to 70~80% of total laboratory occupancy time spent on these tricky matters and consequently restricting the certification throughput.

How is the Number of 70~80% Calculated for Time Spent on Manual Tuning?


A standard anti-islanding test sequence defined by IEEE 1547.1 can be simplified by expressing the total time per test as:$$
T_{total} = \sum_{n=1}^{k} (t_{calc} + t_{switch} + t_{verify}) + \sum_{n=1}^{k} t_{run}
$$where \(k\) represents the number of test points (e.g., 25%, 50%, 66%, 100% load levels, often with multiple repetitions per point).

Preparation Phase (\(T_{setup}\))

  • \(t_{calc}\): Calculation of R/L/C parameters required to achieve \(Q_f = 2.5\) under a specific power level.
  • \(t_{switch}\): Manual switching of relay groups (e.g., S2) and reconfiguration of load banks.
  • \(t_{verify}\): Fine-tuning of \(R\) and \(L\) using a power analyzer until \(\Delta P, \Delta Q \approx 0\).
    This is typically the most time-consuming step due to thermal drift and component tolerance.

Execution Phase (\(T_{run}\))

  • Open switch S1 and observe whether the inverter ceases operation within the required disconnection time (e.g., 2 seconds).
  • The actual data acquisition process typically takes only a few seconds per test.

Empirical Time Estimation

In conventional RLC load bank setups:

  • Preparation phase (\(T_{setup}\)): approximately 30–45 minutes per test point (including switching and tuning).
  • Execution phase (\(T_{run}\)): approximately 5–10 minutes including measurement and data logging.

Time Distribution

The proportion of preparation time can be estimated as:

$$
\frac{45}{45 + 10} \approx 81\%
$$

After accounting for additional factors such as thermal stabilization and report processing, the industry commonly recognizes that approximately 70%–80% of the total testing time is spent on non-effective test preparation rather than actual data acquisition.


 

Thermal Stability, Dissipation Management and Energy Cost

RLC load banks are purely resistive during operation – a feature that converts into the critical challenges especially when the testing application is for high-power utility-scale inverters.

Devices among the test platform and within the RLC load such as resistive and inductive elements are subject to thermal drift during the testing process due to the considerable heat generated. Results will be the inevitable fluctuation of their impedance value while they heat up. Subsequently, the shifting parameters will affect the equilibrium from the calibrated \(Q_f = 2.5\) target.

The 100% dissipated power stands for significant stresses for heat management, apart from that, the energy is converted into waste heat suggesting significant test cost. While handling these challenges an extensive cooling infrastructure is necessary, the laboratory inevitably confronts the costly allocation of resources and the suboptimal results acquisition.

Modern Anti-Islanding Test with Grid Simulator of Software-Defined RLC Modelling

The latest power electronic technologies and test platforms such as those four-quadrant power supplies by ActionPower propose a different approach to that of conventional one with integrated hardware and software controls for emulating the electrical behaviours of RLC load bank. One of our technical articles named “How Do Grid Simulator Approximate Real-World Grid Impedance with FPGA-Based RLC Modelling?” provided some in-depth insights.

Grid Impedance Modeling - A clean studio shot against a light-blue background featuring the text
Fig 4. Grid Impedance Modelling with ActionPower Grid Simulator – Credit: ActionPower

As illustrated in Figure 5, this modern architecture leverages the high-speed digital control loops of a Four-Quadrant Regenerative Grid Simulator to emulate the precise impedance characteristics of a resonant RLC network. Drawbacks including hardware management and thermal stress, as well as testing sequence setup challenges are fundamentally eliminated. The setup in Fig 5. offers a range of advantages including:

modern anti islanding test with integrated RLC load bank - System block diagram showing the testing architecture for EUT Inverters. On the left, ACTION-brand Grid Emulators are shown with icons representing Integrated RLC Modelling. Four connection lines pass through Relays (S1) and Relays (S3) to reach the central EUT Inverters block. On the right side, the inverters connect to ACTION-brand Solar/Battery Emulators.
Fig 5. Anti-Islanding Test Platform Setup for Inverters with RLC-Modelling Integrated Grid Emulator

Rapid Configuration

Users can directly configure R, L, and C values or define the desired quality factor \(Q_f\). The simulator automatically calculates and maintains the corresponding impedance in real time, eliminating the need for manual tuning.

True Closed-Loop Interaction

Unlike static load banks, the simulator operates in a closed-loop manner, dynamically interacting with the inverter. This allows accurate reproduction of transient behaviours during grid disconnection, which is critical for validating anti-islanding performance under realistic conditions.

Regenerative Operation

Advanced grid simulators support regenerative operation, feeding energy back to the utility grid. This significantly reduces energy consumption and enables long-duration, high-power testing without excessive heat dissipation.

Discover ActionPower’s Model Ranges of Four-Quadrant Grid Simulator with Integrated RLC-Modelling Circuit

ActionPower has a range of successful stories to share where clients from the renewable energy industries rely on our testing systems and grid simulators with four-quadrant operation capability and, above all, the integrated RLC-modelling circuit, for validating the grid code compliance of their inverters and power conversion systems.

While fundamentally all of our grid simulators are with 4-quadrant coverage and regenerative load capability apart from RLC impedance emulation functions, there are some technical differences to concern and architectural facts that for your different use cases and deployment environment the optimal options may vary. The below table serves as a preliminary selection guideline, following which you may either contact us or explore through our ranges of programmable power supplies to study further the technical specifications:

ModelDescriptionFunctions & Key Features
CORTEX AC Programmable Power SupplyRack-Mount Modular Design
AC, DC, AC+DC, and DC+AC Output
  • High-frequency and bandwidth models available
  • Optional PHIL function integration
  • Parallel up to 220 kVA
  • Integrated RLC modelling circuit
NEXUS AC Programmable Power SupplyModule-Based Cabinet System
  • Scalable at within-the-cabinet level and inter-cabinet level
  • Redundancy design, flexible recomposition
  • RLC Modelling for anti-islanding test
TITAN Regenerative Grid SimulatorTower-type utility-scale high-power grid simulator
  • Ultra-high unit power from 300kVA to 1MVA
  • Parallel to 10MVA maximum power
  • High-power system with uncompromised dynamics and response
  • RLC Modelling for anti-islanding test

Wrap-Ups

The present application note has covered from both qualitative comparison and technical-analysis-based perspective about how modern grid compliance and anti-islanding test benefits from RLC-modelling integrated test system and eliminates the bottlenecks and drawbacks with conventional RLC load bank approach.

ActionPower’s excellence in programmable AC power and grid simulators supports our strategic partners in the renewable energy industry to break through the boundaries of evolving grid code and compliance regulations, take the latest test challenges following the sustainable goals and clean energy initiatives. For further information about our technical approach to grid compliance testing, you may either submit a contact form or reach out to our field application team by sending an email.

Bibliography

  • [1] Electric Rule 21: Generating Facility Interconnections, Carlifornia Public Utilities Commission, Link
  • [2] Islanding Detection – What, Why and How? The Energy Consortium, Link
  • [3] Evaluation on non-detection zone of passive islanding detection techniques for synchronous distributed generation, IEEE Symposium on Computer Applications & Industrial Electronics (ISCAIE), Langkawi, Malaysia, 2015, Link
  • [4] Introduction to the IEEE 1547 Standard for DER Grid Interconnection, with Additional Energy Storage Considerations, IEEE Standards Committee 21, September 10, 2024, Link
  • [5] An Islanding Detection Method for Grid-Connect Inverter based on Parameter Optimized Variational Mode Decomposition and Deep Learning. Front. Energy Res. 13:1445522., Link
  • [6] Integrated Microgrid Islanding Detection with Phase Angle Difference for Reduced Nondetection Zone, International Journal of Energy Research, 2023, 2275191, 17 pages, 2023, Link

 


Zhiwei Bao 鲍智威, with Wikidadata entry www.wikidata.org/wiki/Q141170017, is an SEO Engineer at ActionPower, Technical Copywriter for Power Electronics and Grid Compliance | Zhiwei Bao is also owner of ÉLITER Packaging Machinery, as mechanical engineer and inventor, holding more than 20 patents
About the Author

Zhiwei Bao

Industrial Automation Power Electronics Product Marketing Field Application

Zhiwei Bao holds 20+ patents in the field of mechanical engineering and is keen on industrial automation and product marketing. His interdisciplinary background, along with his passion and initiative for learning, has led him to a profound understanding of power electronics. He manages the technical copywriting for programmable power and testing topics at ActionPower through product-marketing-driven approaches.

About Zhiwei Bao
Quick Model Access

Smart Discovery

Access our Power Supply Wizard to find the right programmable power supply for your use cases and testing scenarios.

discover programmable power supply by filtering with current, voltage and power ranges
CONTACT US

Contact Us

Professionalism is what we care about. Why not email us with your technical requirements fully explained rather than submitting a simple message so that we revert more proactively with detailed solutions?

Subscribe to Newsletter

Thank you for subscribing!